An Act of the Scottish Parliament to authorise the reconstruction of a railway from a point in Midlothian immediately south of Newcraighall in the City of Edinburgh to Tweedbank in Scottish Borders, including stations at Shawfair, Eskbank, Newtongrange, Gorebridge, Stow, Galashiels and Tweedbank; to make provision concerning planning agreements and developer contributions relating to the railway; and for connected purposes.

Part 1 SWorks, etc.

WorksS

1Authority to construct worksS

(1)The authorised undertaker is hereby authorised to construct the authorised works, namely—

(a)the railway works referred to in section 2 below (“the railway works”); and

(b)the ancillary works referred to in section 3 below (“the ancillary works”).

(2)The extent of the works for which authority is given by this section is subject to section 4 below (which permits deviation within limits from the lines and levels shown on the Parliamentary plans and sections).

(3)If the authorised undertaker commences construction of the authorised works it shall construct the whole of the railway comprising the railway works (including all the stations) referred to in schedule 1 to this Act.

2The railway worksS

The railway works are the works situated within the lateral limits of deviation shown on the Parliamentary plans, at the levels shown on the Parliamentary sections and specifically described in schedule 1 to this Act.

3The ancillary worksS

(1)The ancillary works are such works of the nature described in schedule 2 to this Act as may be necessary or expedient for the purposes of, in connection with or in consequence of the construction of the railway works.

(2)Where the authorised undertaker lays down works for the accommodation of cables or other apparatus for the purposes of the authorised works, the ancillary works may include, in or in connection with such works, accommodation for the apparatus of any other person and facilities for access to such accommodation and may do so notwithstanding that such works and facilities may be for the exclusive use of that other person.

4Permitted deviation within limitsS

In constructing or maintaining any of the authorised works the authorised undertaker may—

(a)deviate laterally from the lines or situations shown on the Parliamentary plans within the limits of deviation for that work shown on those plans; and

(b)deviate vertically from the levels shown on the Parliamentary sections—

(i)to any extent not exceeding 3 metres upwards; and

(ii)to any extent downwards as may be necessary or expedient.

5Access to worksS

(1)The authorised undertaker may, for or in connection with the authorised works, form and lay out means of access, or improve existing means of access—

(a)at the points shown on the Parliamentary plans; or

(b)in such location or locations within the limits of deviation or the limits of land to be acquired or used as may be approved by the roads authority.

(2)Approval of the roads authority under subsection (1)(b) above shall not be unreasonably withheld.

6Construction and maintenance of new or altered roadsS

(1)Each of Works Nos. 1C, 1D, 1G, 1H, 1J, 1K, 1L, 2B, 2C, 2D, 3E, 5A, 5B, 5D, 5E, 5F, 5G, 7A, 7B, 8A, 10B, 10D, 10E, 10F, 10G, 10H, 10K and 10L shall be completed to the reasonable satisfaction of the roads authority and shall, unless otherwise agreed, be maintained—

(a)by and at the expense of the authorised undertaker for a period of 12 months from its completion; and

(b)at the expiry of that period by and at the expense of the roads authority.

(2)Where a road is altered or diverted under this Act, the altered or diverted part of the road shall when completed to the reasonable satisfaction of the roads authority, unless otherwise agreed, be maintained—

(a)by and at the expense of the authorised undertaker for a period of 12 months from its completion; and

(b)at the expiry of that period by and at the expense of the roads authority.

7Vesting of private roadsS

(1)Each of the private roads comprising Works Nos. 1B and 7B shall, unless otherwise agreed between the authorised undertaker and—

(a)in the case of Work No. 1B the owner of the land abutting the north-west boundary of plot no. 40 on the Parliamentary plans in the local government area of Midlothian; and

(b)in the case of Work No. 7B the owner of Allanshaugh Farm, Allanshaugh,

be maintained by and at the expense of the authorised undertaker for a period of 12 months from its completion.

(2)At the expiry of the period during which the authorised undertaker is liable to maintain any road under subsection (1) above the road shall by virtue of this section vest in the person referred to in that subsection in relation to the road.

8Private crossingsS

(1)If the authorised undertaker proceeds with the authorised works it shall make and maintain the private crossings described in columns (1), (2) and (3) of Part 1 of schedule 3 to this Act (“the continuing private crossings”).

(2)The continuing private crossings shall be provided for the use of the persons (if any) entitled under any existing enactment to use the existing private crossings at those points, and those persons shall be entitled to use the continuing private crossings on the same basis in all respects as they are entitled to use the existing private crossings.

(3)The authorised undertaker shall provide and maintain at each of the continuing private crossings such equipment as may from time to time be required for compliance with any requirement made by the Secretary of State under any enactment and, subject to such compliance, as may be agreed in relation to any crossing between the authorised undertaker and the person entitled to use the crossing.

(4)Nothing in section 60 of the 1845 Act, as incorporated with this Act, shall require the authorised undertaker to provide any other private crossing for the purpose of making good any interruption caused by the authorised works to the use of any lands to which there attaches an entitlement to use any of the continuing private crossings.

(5)The authorised undertaker shall stop up and discontinue the private crossings described in Part 2 of schedule 3 to this Act and on such stopping up and discontinuance all rights of way across those crossings shall be extinguished.

(6)Any person who suffers loss by the extinguishment of any right of way over any of the private crossings described in Part 2 of schedule 3 to this Act shall be entitled to compensation to be determined, in case of dispute, under the 1963 Act.

9Permanent stopping up of roadsS

(1)Subject to the provisions of this section, the authorised undertaker may, in connection with the construction of the authorised works, stop up each of the roads specified in columns (1) and (2) of Part 1 of schedule 4 to this Act to the extent specified (by reference to the letters and numbers shown on the relevant Parliamentary plans) in column (3) of that Part.

(2)No part of a road specified in Part 1 of schedule 4 to this Act in relation to which a substitute road is specified in column (4) of that Part shall be stopped up under this section until the substitute has been completed to the reasonable satisfaction of the roads authority and is open for public use.

(3)No part of a road specified in Part 1 of schedule 4 to this Act in relation to which neither a substitute road nor an alternative is specified in column (4) of that Part shall be stopped up under this section unless all the land which abuts it falls within one or more of the following categories, namely—

(a)land to which there is no right of access directly from the road or part to be stopped up;

(b)land to which there is reasonably convenient access otherwise than directly from the road or part to be stopped up;

(c)land as respects which the owners and occupiers have agreed to the stopping up of the road or part; and

(d)land of which the authorised undertaker has taken possession under section 24(1) below.

(4)Where any part of a road has been stopped up under this section—

(a)all rights of way over or along the stopped up part of the road shall be extinguished; and

(b)the authorised undertaker may, without making any payment, appropriate and use for the purposes of the authorised works so much of the site of the road as is bounded on both sides by land within the limits of deviation of the authorised works.

(5)Any person who suffers loss by the extinguishment of any private right of way under this section shall be entitled to compensation to be determined, in case of dispute, under the 1963 Act.

Supplemental powersS

10Temporary stopping up, alteration or diversion of roadsS

(1)During and for the purposes of the execution of the authorised works the authorised undertaker may temporarily stop up, alter or divert any road and may for any reasonable time—

(a)divert the traffic from the road; and

(b)subject to subsection (2) below, prevent all persons from passing along the road.

(2)The authorised undertaker shall provide reasonable access for pedestrians going to or from premises abutting on a road affected by the exercise of the powers conferred by this section if there would otherwise be no such access.

(3)Without prejudice to the generality of subsection (1) above, the authorised undertaker may temporarily stop up, alter or divert each of the roads specified in columns (1) and (2) of Part 2 of schedule 4 to this Act to the extent specified (by reference to the letters and numbers shown on the relevant Parliamentary plans) in column (3) of that Part, and may for any reasonable time—

(a)divert the traffic from the road; and

(b)subject to subsection (2) above, prevent all persons from passing along the road.

(4)The authorised undertaker shall not exercise the powers conferred by this section—

(a)in relation to any road specified as mentioned in subsection (3) above, without first consulting the road works authority; and

(b)in relation to any other road, without the consent of the road works authority.

(5)Consent under subsection (4)(b) above shall not be unreasonably withheld but may be given subject to such reasonable conditions as the road works authority may require.

(6)Any question whether—

(a)consent under subsection (4)(b) above has been unreasonably withheld; or

(b)a condition imposed under subsection (5) above is unreasonable,

shall be determined by arbitration.

11Discharge of waterS

(1)The authorised undertaker may use any available watercourse or any public sewer or drain for the drainage of water, and for that purpose may—

(a)lay down, take up and alter pipes; or

(b)make openings into, and connections with the watercourse, sewer or drain,

on any land within the limits of deviation or the limits of land to be acquired or used.

(2)The authorised undertaker shall not discharge any water into any public sewer or drain except with the consent of the person to whom it belongs; and such consent may be given subject to such terms and conditions as the person may reasonably impose but shall not be unreasonably withheld.

(3)The authorised undertaker shall not make any opening into any public sewer or drain except in accordance with plans approved by, and under the superintendence (if provided) of, the person to whom the sewer or drain belongs, but such approval shall not be unreasonably withheld.

(4)The authorised undertaker shall take such steps as are reasonably practicable to secure that any water discharged under the powers conferred by this section is as free as may be practicable from gravel, soil or other solid substance or oil or matter in suspension.

(5)Any difference under this section arising between the authorised undertaker and a person who owns a public sewer or drain shall be determined by arbitration.

(6)Nothing in this section shall affect the operation of Part IV of the 1991 Act.

(7)In this section—

  • public sewer or drain” means a sewer or drain which belongs to Scottish Water, a private provider who has made an agreement with Scottish Water under section 1(2)(b) of the Sewerage (Scotland) Act 1968 (c. 47) (duty of local authority to provide sewerage for their area) or a roads authority; and

  • watercourse” includes all rivers, streams, ditches, cuts, culverts, dykes, sluices, sewers and passages through which water flows except a public sewer or drain.

12Safeguarding works to buildingsS

(1)The authorised undertaker may at its own expense and from time to time carry out such safeguarding works to any building any part of which is within 20 metres of any part of the authorised works as the authorised undertaker considers to be necessary or expedient.

(2)The powers conferred by this section shall be exercised subject to and in accordance with schedule 5 to this Act.

(3)In this section and that schedule—

(a)building” includes any structure or erection or any part of a building, structure or erection;

(b)any reference to a building within a specified distance of a work includes—

(i)in the case of a work under the surface of the ground, a reference to any building within the specified distance of the point on the surface below which the work is situated; and

(ii)where a work has not commenced, a reference to a building within the specified distance of the proposed site of the work; and

(c)safeguarding works”, in relation to a building, means—

(i)underpinning, strengthening and any other works the purpose of which is to prevent damage which may be caused to the building by the construction, maintenance or operation of the authorised works; and

(ii)any works the purpose of which is to remedy any damage which has been caused to the building by the construction, maintenance or operation of the authorised works.

Part 2 SLand

Powers of acquisitionS

13Authority to acquire landS

(1)Subject to subsection (2) and sections 27, 29 and 30(4) below, the authorised undertaker is hereby authorised to acquire compulsorily—

(a)such of the land shown on the Parliamentary plans within the limits of deviation for the authorised works as—

(i)is described in the book of reference; and

(ii)may be required by the authorised undertaker for the purposes of the authorised works; and

(b)such of the land so shown within the limits of land to be acquired or used and so described as—

(i)is specified in columns (1), (2) and (3) of Part 1 of schedule 6 to this Act; and

(ii)may be required for the purposes specified in relation to that land in column (4) of that Part.

(2)Notwithstanding subsection (1) above, the authorised undertaker does not have power to acquire compulsorily the land in Scottish Borders shown numbered 31 and 32 on sheet 33 of the Parliamentary plans.

14Acquisition of subsoil or rightsS

(1)In exercise of the powers conferred by section 13 above the authorised undertaker may, as regards any land authorised to be acquired under that section, compulsorily acquire—

(a)so much of the subsoil of the land; or

(b)such servitudes or other rights over the land,

as may be required for any purpose for which that land may be acquired under that section.

(2)Rights acquired under subsection (1) above may be heritable or moveable, and may be created as new rights for the purpose of acquisition under this section.

(3)Where the authorised undertaker acquires subsoil or a right over land under subsection (1) above, the authorised undertaker shall not be required to acquire an interest in the land which is greater than that right.

(4)Accordingly section 90 of the 1845 Lands Act (which provides that the owner of a house, building or manufactory who is willing to sell the whole property cannot be required to sell only part) shall not apply to any compulsory acquisition under this section or under section 15 below.

(5)Subject to subsections (6) and (7) below, the Lands Clauses Acts, as incorporated with this Act, shall have effect with the modifications necessary to make them apply to the compulsory acquisition of new rights under this section or under section 15 below as they apply to the compulsory acquisition of land.

(6)As so having effect, references in those Acts to land shall be treated as, or as including, references to new rights or to the land over which new rights are to be exercisable.

(7)Section 61 of the 1845 Lands Act (estimation of purchase money and compensation) shall apply to the compulsory acquisition of such a right as if for the words from “value” to “undertaking” there were substituted the words “ extent (if any) to which the value of the land in or over which the right is to be acquired is depreciated by the acquisition of the right ”.

15Purchase of specific new rights over landS

(1)Subject to section 27 below, the authorised undertaker may acquire compulsorily in or over any of the land shown on the Parliamentary plans within any limits of land to be acquired or used and specified in columns (1), (2) and (3) of Part 2 of schedule 6 to this Act, such servitudes or other new rights as it requires for the purposes mentioned in column (4) of that Part.

(2)The powers conferred by this section are additional to the powers conferred by section 14 above.

16Rights in roads or public placesS

(1)The authorised undertaker may enter upon and appropriate so much of the subsoil of, or air-space over, any road or public place that is authorised to be compulsorily acquired under section 13 above as may be required for the purposes of the authorised works and may use the subsoil or air-space for those purposes.

(2)The powers conferred by subsection (1) above may be exercised in relation to a road or place without the authorised undertaker being required to acquire any part of the road or place or any servitude or right in relation to it.

[F1(3)The powers conferred by this section constitute a real right.]

(4)Any person, who is an owner or occupier of land in respect of which the power of appropriation conferred by subsection (1) above is exercised without the authorised undertaker acquiring any part of that person's interest in the land, and who suffers loss by reason of the exercise of that power, shall be entitled to compensation to be determined, in case of dispute, under the 1963 Act.

(5)Subsection (2) above shall not apply in relation to—

(a)any subway or underground building; or

(b)any cellar, vault, arch or other construction in or on a road which forms part of a building fronting onto the road or place.

17Temporary use of land for construction of worksS

(1)The authorised undertaker may, in connection with the carrying out of the authorised works—

(a)enter upon and take temporary possession of any of the land specified in columns (1), (2) and (3) of schedule 7 to this Act for the purpose specified in relation to that land in column (4) of that schedule relating to the authorised works specified in column (5) of that schedule;

(b)remove any buildings and vegetation from that land; and

(c)construct temporary works (including the provision of means of access) and buildings on the land.

(2)Not less than 28 days before entering upon and taking temporary possession of land under this section the authorised undertaker shall serve notice of the intended entry on the owners and occupiers of the land.

(3)The authorised undertaker may not, without the agreement of the owners of the land, remain in possession of any land under this section after the end of the period of one year beginning with the date of completion of the work specified in relation to that land in column (5) of schedule 7 to this Act.

(4)Before giving up possession of land of which temporary possession has been taken under this section, the authorised undertaker shall remove all temporary works and restore the land to the reasonable satisfaction of the owners of the land; but the authorised undertaker shall not be required to replace a building removed under this section.

(5)The authorised undertaker shall pay compensation to the owners and occupiers of land of which temporary possession is taken under this section for any loss or damage arising from the exercise in relation to the land of the powers conferred by this section.

(6)Any dispute as to a person's entitlement to compensation under subsection (5) above, or as to the amount of the compensation, shall be determined under the 1963 Act.

(7)Without prejudice to section 20 below, nothing in this section shall affect any liability to pay compensation under section 6 or 36 of the 1845 Act or under any other enactment in respect of loss or damage arising from the execution of any works, other than loss or damage for which compensation is payable under subsection (5) above.

(8)The powers of compulsory acquisition of land conferred by this Act shall not apply in relation to any land of which temporary possession has been taken under subsection (1) above, except that the authorised undertaker shall not be precluded from acquiring—

(a)interests in subsoil;

(b)new rights; or

(c)land within the limits of land to be acquired or used for any purpose specified in relation to that land in schedule 6 to this Act.

(9)Where the authorised undertaker takes possession of land under this section, it shall not be required to acquire the land or any interest in it.

(10)In this section “building” includes any structure or erection.

CompensationS

18Disregard of certain interests and improvementsS

(1)In assessing the compensation (if any) payable on the acquisition from any person of any land under this Act, the tribunal shall not take into account—

(a)any interest in land; or

(b)any enhancement of the value of any interest in land by reason of any building erected, works executed or improvement or alteration made on relevant land,

if the tribunal is satisfied that the creation of the interest, the erection of the building, the execution of the works or the making of the improvement or alteration was not reasonably necessary and was undertaken with a view to obtaining compensation or increased compensation.

(2)In subsection (1) above “relevant land” means the land acquired from the person concerned or any other land with which that person is, or was at the time when the building was erected, the works executed or the improvement or alteration made, directly or indirectly concerned.

19Set-off of betterment against compensationS

In determining the amount of compensation or purchase money payable to any person in respect of an interest in land acquired under this Act in a case where—

(a)the person has an interest in any other land contiguous with or adjacent to the land so acquired; and

(b)the value of the person's interest in any such contiguous or adjacent land is enhanced by reason of the works authorised by this Act or any of them,

the amount of the enhancement in value shall be set off against the compensation or purchase money.

20No double recoveryS

Compensation shall not be payable in respect of the same matter both under this Act and under any other enactment, any contract or any rule of law.

SupplementaryS

21Acquisition of part of certain propertiesS

(1)This section shall apply instead of section 90 of the 1845 Lands Act in any case where—

(a)a notice to treat is served on a person (“the owner”) under that Act (as incorporated with this Act by section 52 below) in respect of—

(i)land forming only part of a house, building or factory; or

(ii)land consisting of a house with a park or garden,

(“the land subject to the notice to treat”); and

(b)a copy of this section is served on the owner with the notice to treat.

(2)In such a case, the owner may, within the period of 21 days beginning with the day on which the notice was served, serve on the authorised undertaker a counter-notice objecting to the sale of the land subject to the notice to treat and stating that the owner is willing and able to sell the whole (“the land subject to the counter-notice”).

(3)If no such counter-notice is served within that period, the owner shall be required to sell the land subject to the notice to treat.

(4)If such a counter-notice is served within that period, the question whether the owner shall be required to sell only the land subject to the notice to treat shall, unless the authorised undertaker agrees to take the land subject to the counter-notice, be referred to the tribunal.

(5)If on such a reference the tribunal determines that the land subject to the notice to treat can be taken—

(a)without material detriment to the remainder of the land subject to the counter-notice; or

(b)in the case of part of land consisting of a house with a park or garden, without material detriment to the remainder of the land subject to the counter-notice and without seriously affecting the amenity or convenience of the house,

the owner shall be required to sell the land subject to the notice to treat.

(6)If on such a reference the tribunal determines that only part of the land subject to the notice to treat can be taken—

(a)without material detriment to the remainder of the land subject to the counter-notice; or

(b)in the case of part of land consisting of a house with a park or garden, without material detriment to the remainder of the land subject to the counter-notice and without seriously affecting the amenity or convenience of the house,

the notice to treat shall be deemed to be a notice to treat for that part.

(7)If on such a reference the tribunal determines that—

(a)the land subject to the notice to treat cannot be taken without material detriment to the remainder of the land subject to the counter-notice; but

(b)the material detriment is confined to a part of the land subject to the counter-notice,

the notice to treat shall be deemed to be a notice to treat for the land to which the material detriment is confined in addition to the land already subject to the notice, whether or not the additional land is land which the authorised undertaker is authorised to acquire compulsorily under this Act.

(8)If the authorised undertaker agrees to take the land subject to the counter-notice, or if the tribunal determines that—

(a)none of the land subject to the notice to treat can be taken without material detriment to the remainder of the land subject to the counter-notice or, as the case may be, without material detriment to the remainder of the land subject to the counter-notice and without seriously affecting the amenity or convenience of the house; and

(b)that the material detriment is not confined to a part of the land subject to the counter-notice,

the notice to treat shall be deemed to be a notice to treat for the land subject to the counter-notice whether or not the whole of that land is land which the authorised undertaker is authorised to acquire compulsorily under this Act.

(9)In any case where by virtue of a determination by the tribunal under this section a notice to treat is deemed to be a notice to treat for less land or more land than that specified in the notice, the authorised undertaker may, within the period of 6 weeks beginning with the day on which the determination is made, withdraw the notice to treat; and if it does so it shall pay the owner compensation for any loss or expense occasioned to the owner by the giving and withdrawal of the notice, to be determined in case of dispute by the tribunal.

(10)Where the owner is required under this section to sell only part of a house, building or factory or of land consisting of a house with a park or garden, the authorised undertaker shall pay the owner compensation for any loss sustained by the owner due to the severance of that part in addition to the value of the interest acquired.

22Extinction or suspension of rights of wayS

(1)Subject to subsection (6) below, all private rights of way over land subject to compulsory acquisition under this Act shall be extinguished—

(a)as from the acquisition of the land by the authorised undertaker, whether compulsorily or by agreement; or

(b)on the entry on the land by the authorised undertaker under section 24 below,

whichever is sooner.

(2)Subject to subsection (7) below, all private rights of way over land of which the authorised undertaker takes temporary possession under this Act shall be suspended and unenforceable for as long as the authorised undertaker remains in lawful possession of the land.

(3)Any person who suffers loss by the extinguishment or suspension of any private right of way under this section shall be entitled to compensation to be determined, in case of dispute, under the 1963 Act.

(4)This section does not apply in relation to any right of way to which section 224 or 225 of the Town and Country Planning (Scotland) Act 1997 (c. 8) (extinguishment of rights of statutory undertakers etc.) applies.

(5)Subsections (1) and (2) above shall have effect subject to any agreement made (whether before or after this Act comes into force) between the authorised undertaker and the person entitled to the private right of way.

(6)The authorised undertaker may, before whichever is the sooner of the events specified in paragraphs (a) and (b) of subsection (1) above, determine that any right of way specified in the determination is capable of being exercised compatibly with the construction and maintenance of the relevant part of the authorised works, and that subsection (1) above shall not apply to that right.

(7)The authorised undertaker may, at any time before or after temporary possession of any land is taken, determine that any right of way specified in the determination is capable of being exercised, in whole or to such extent as may be specified in the determination, compatibly with the temporary use of the land under this Act, and that subsection (2) above shall not apply to that right or shall only apply to the extent specified in the determination.

(8)Notice of a determination under this section shall be posted on the land mentioned in subsection (1) or, as the case may be, (2) above—

(a)in the case of a determination under subsection (6) above, for the period of 28 days after the sooner of the events specified in paragraphs (a) and (b) of subsection (1) above; and

(b)in the case of a determination under subsection (7) above, throughout the period that the authorised undertaker remains in possession of the land.

(9)This section does not apply to any of the land specified in columns (1), (2) and (3) of Part 2 of schedule 6 to this Act (land outside the limits of deviation in which rights are to be acquired).

23Power to enter land for survey, etc.S

(1)The authorised undertaker may, in relation to any land within the limits of deviation or the limits of land to be acquired or used, for the purposes of this Act—

(a)survey or investigate the land;

(b)without prejudice to the generality of paragraph (a) above, make trial holes in such positions as the authorised undertaker thinks fit on the land to investigate the nature of the surface layer and subsoil and remove water and soil samples;

(c)without prejudice to the generality of paragraph (a) above, carry out archaeological investigations on the land;

(d)take steps to protect or remove any flora or fauna on the land where the flora or fauna may be affected by the carrying out of the works;

(e)place on, leave on and remove from the land apparatus for use in connection with the exercise of any power conferred by paragraphs (a) to (d) above; and

(f)enter on the land for the purpose of exercising any power conferred by paragraphs (a) to (e) above.

(2)No land may be entered, or equipment placed or left on or removed from land, under subsection (1) above, unless—

(a)on the first occasion at least seven days'; and

(b)on subsequent occasions not less than three days',

notice has been served on every owner and occupier of the land.

(3)Any person entering land under this section on behalf of the authorised undertaker—

(a)shall, if so required, before or after entering the land produce written evidence of authority to do so; and

(b)may enter with such vehicles and equipment as are necessary for the purpose of exercising any of the powers conferred by subsection (1) above.

(4)No trial hole shall be made under this section in a carriageway or footway without the consent of the road works authority, but such consent shall not be unreasonably withheld.

(5)The authorised undertaker shall make compensation for any damage occasioned, by the exercise of the powers conferred by this subsection, to the owners and occupiers of the land, such compensation to be determined, in case of dispute, under the 1963 Act.

24Further powers of entryS

(1)At any time after notice to treat has been served in respect of any land which may be purchased compulsorily under this Act the authorised undertaker may enter on and take possession of the land.

(2)No land may be entered under subsection (1) above unless at least 28 days' notice has been given to the owner and occupier of the land specifying the land, or part of the land, of which possession is to be taken.

(3)The authorised undertaker may exercise the powers of this section without complying with sections 83 to 89 of the 1845 Lands Act before such exercise.

(4)Compensation for the land of which possession is taken under this section, and interest on the compensation awarded, shall be payable as if sections 83 to 89 of the 1845 Lands Act had been complied with.

(5)Nothing in this section affects the operation of section 48 of the Land Compensation (Scotland) Act 1973 (c. 56).

25Persons under disability may grant servitudes, etc.S

(1)Persons empowered by the Lands Clauses Acts to sell and convey or dispose of lands may grant to the authorised undertaker a servitude, right or privilege required for any of the purposes of this Act in, over or affecting any such lands.

(2)A person may not under this section grant a servitude, right or privilege of water in which persons other than the grantor have an interest.

(3)The provisions of the Lands Clauses Acts with respect to lands and feu duties or ground annuals shall, so far as applicable, apply to any grant under this section and to the servitudes, rights and privileges granted.

26Parliamentary plans and book of reference: adjustments agreed with landowners and correction of errorsS

(1)Where—

(a)the authorised undertaker has entered into a binding obligation (“the obligation”) not to acquire any land within the limits of deviation or the limits of land to be acquired or used; and

(b)either the authorised undertaker or the owner desires to reflect that commitment by way of either amendment of, or addendum to, either or both the Parliamentary plans and the book of reference,

the authorised undertaker or the owner of the land may (after giving the notice required by subsection (3) below) apply summarily to the sheriff under this section.

(2)If the Parliamentary plans or the book of reference are inaccurate in—

(a)their description of any land; or

(b)their statement or description of the ownership or occupation of any land,

the authorised undertaker may (after giving the notice required by subsection (3) below) apply summarily to the sheriff for correction of such inaccuracy.

(3)The notice required by subsections (1) and (2) above is 10 days' prior notice—

(a)in the case of a notice by the authorised undertaker, to the owner, lessee and occupier of the land in question; and

(b)in the case of a notice by an owner, to the authorised undertaker and to any lessee or occupier of the land in question.

(4)Any person to whom a notice has been given under subsection (1) or (2) above may, within the period of 10 days from the giving of the notice, give to the sheriff and the person who gave the notice a counter-notice in writing that the person disputes—

(a)in the case of an application under subsection (1) above, that the proposed amendment accurately reflects the obligation; and

(b)in the case of an application under subsection (2) above, that there is an inaccuracy which may be amended under this section.

(5)In relation to any application under this section which has not been the subject of a counter-notice, if it appears to the sheriff—

(a)that the proposed amendment accurately reflects the obligation; or

(b)that the inaccuracy arose from mistake,

as the case may be, the sheriff shall certify the fact accordingly.

(6)A certificate relating to an application under subsection (2) above shall state in what respect any matter is misstated or wrongly described.

(7)If any counter-notice is given pursuant to subsection (4) above, the sheriff shall, before making any decision on the application, cause a hearing to be held.

(8)The certificate shall be deposited in the office of the Clerk of the Parliament.

(9)On the making of the deposit required by subsection (8) above—

(a)the Parliamentary plans and the book of reference shall be deemed to be corrected according to the certificate; and

(b)it shall be lawful for the authorised undertaker to take the land or, as the case may be, a right over the land and execute the works in accordance with the certificate.

(10)The Clerk of the Parliament shall keep every certificate deposited under this section with the Parliamentary plans or book of reference to which it relates.

(11)An application under subsection (1) or (2) above may only be made in respect of land identified in the book of reference and on the Parliamentary plans.

(12)In this section “the sheriff” means the sheriff principal of, or any sheriff appointed for, the sheriffdom of Lothian and Borders.

27Period for compulsory acquisition of landS

(1)The authority given by sections 13 and 15 above for the compulsory acquisition of land and new rights for the purposes of this Act shall cease five years from the date on which this Act comes into force.

(2)The powers conferred by sections 13, 14 and 15 above for the compulsory acquisition of such land and servitudes or other rights shall, for the purposes of this section, be deemed to have been exercised in relation to any land, servitude or right if before the expiry of five years from the date on which this Act comes into force notice to treat has been served in respect of that land, servitude or right.

28Extension of timeS

(1)On the application of the authorised undertaker, the Scottish Ministers may, by order, extend, or further extend, the period referred to in subsection (1) of section 27 above provided that—

(a)such application is made prior to the expiry of the period or any extension to it; and

(b)the period referred to in that subsection, taken together with any extension to it, shall not exceed 10 years in total.

(2)If the Scottish Ministers extend, or further extend, the period referred to in subsection (1) of section 27 above, subsection (2) of that section shall have effect as if, for the period referred to in it, there were substituted the extended, or further extended, period.

(3)The power of the Scottish Ministers to make orders under subsection (1) above shall be exercisable by statutory instrument.

(4)A statutory instrument containing such an order shall be subject to annulment in pursuance of a resolution of the Parliament.

29Acquisition of land for Work No. 1BS

The authorised undertaker shall not construct Work No. 1B or acquire any land for that purpose if, before the authorised undertaker serves notice to treat or makes a general vesting declaration in respect of plot no. 40 on the Parliamentary plans in the local government area of Midlothian, there is in existence a private road capable of giving access from Work No. 1C to the CPL Distribution Depot at the former Monkton Hall Colliery, Danderhall.

30Acquisition of land for Works Nos. 1C and 1ES

(1)Subject to subsection (2) below, as soon as may be after the opening for public use of Works Nos. 1C and 1E, the authorised undertaker shall transfer to the owner of the land abutting the northern boundary of the development land so much of the development land as is not permanently required by the authorised undertaker for the purpose of those works.

(2)A transfer under subsection (1) above—

(a)may be subject to the creation for the benefit of the authorised undertaker of such servitudes or other rights in or over the land transferred as the authorised undertaker may require for the purpose of maintaining or operating the authorised works; and

(b)shall be for a consideration calculated as if the land were being transferred pursuant to section 120 of the 1845 Lands Act (which relates to the sale of superfluous lands by an acquiring authority) and determined in case of dispute by the tribunal.

(3)Subsection (4) below shall have effect if before the authorised undertaker serves notice to treat or makes a general vesting declaration in respect of the development land there are in existence bridges in the same position as, and satisfying the authorised undertaker's requirements for—

(a)so much of Work No. 1C as comprises a bridge over the railway (Work No. 1); and

(b)Work No. 1E.

(4)If this subsection has effect, the authorised undertaker shall not acquire or use so much of the development land or plots nos. 43 and 43a on the Parliamentary plans in the local government area of Midlothian as is required for the construction of Works Nos. 1C and 1E, but nothing in this subsection prevents the authorised undertaker from acquiring in or over the development land such servitudes or rights as the authorised undertaker may require for the purpose of maintaining or operating the authorised works.

(5)In this section “the development land” means plots nos. 46 and 46a on the Parliamentary plans in the local government area of Midlothian.

Part 3 SMiscellaneous and general

31Power to fell, etc. trees or shrubsS

(1)The authorised undertaker may fell, lop or cut back the roots of any tree or shrub near any part of the authorised works (or land proposed to be used for the authorised works), if it reasonably believes such action to be necessary in order to prevent the tree or shrub—

(a)from obstructing or interfering with the construction, maintenance or operation of the authorised works or any apparatus used for the purposes of the authorised works; or

(b)from constituting a danger to persons using the authorised works.

(2)In exercising the powers conferred by subsection (1) above, the authorised undertaker shall not do any unnecessary damage to any tree or shrub.

(3)Any person who suffers loss or damage arising from the exercise of the powers conferred by this section shall be entitled to compensation to be determined, in case of dispute, under the 1963 Act.

(4)The following, namely—

(a)an order under section 160(1) of the 1997 Act (tree preservation orders); and

(b)section 172(1) of that Act (which prohibits the doing in a conservation area of any act which might be prohibited by a tree preservation order),

shall not apply to any exercise of the powers conferred by subsection (1) above.

32Powers of disposal, agreements for operation, etc.S

(1)In addition to any thing the authorised undertaker may do by virtue of any enactment or rule of law, it shall be competent for the authorised undertaker to enter into, and carry into effect, in connection with the authorised works, any agreement that includes provision for the matters described in subsection (2).

(2)The matters referred to in subsection (1) are—

(a)the transfer to and vesting in another person of all or any of the functions of the authorised undertaker under this Act, including the powers conferred by this section;

(b)the disposal of the whole or any part of the undertaking consisting of the authorised works and any land held for the purposes of, or in connection with, those works;

(c)the creation of any heritable security, charge or other encumbrance secured on the undertaking.

(3)Any restrictions, liabilities or obligations to which the authorised undertaker is subject—

(a)under this Act; or

(b)under any undertaking or commitment given by, or on behalf of Scottish Borders Council or any other authorised undertaker, at any time, whether before or after the passing of this Act,

shall (notwithstanding any enactment or rule of law) be equally binding on any authorised undertaker.

(4)Within 21 days of the completion of any agreement providing for any matter described in subsection (2)(a), the authorised undertaker making the transfer shall serve notice on the Scottish Ministers stating the name and address of the transferee and the date when the transfer is to take effect.

(5)If an authorised undertaker fails, without reasonable excuse, to comply with the obligation imposed by subsection (4) it shall be guilty of an offence and liable on summary conviction to a fine not exceeding level 3 on the standard scale.

(6)On the completion of an agreement the effect of which is to—

(a)vest any of the authorised works in Network Rail; or

(b)transfer to Network Rail the powers conferred by this Act relating to any of those works,

no further agreement may be made under this section in relation to the works vested or powers transferred by that first agreement.

(7)In subsection (1), an agreement entered into in connection with the authorised works includes any agreement—

(a)with respect to the funding, construction, maintenance and operation of the authorised works and any matter consequential thereon or incidental or ancillary thereto; or

(b)which (whether separately or as part of any other agreement) contains such supplementary, incidental, transitional and consequential provisions as the authorised undertaker may consider to be necessary or expedient.

(8)In this section, unless the context otherwise requires—

  • disposal” includes sale, lease, excambion and charge; and

  • functions” includes powers, duties and obligations.

33Statutory undertakers, etc.S

The provisions of schedule 8 to this Act shall have effect in relation to the authorised works.

34ArbitrationS

(1)Where under any provision of this Act any difference (other than a difference to which the provisions of the Lands Clauses Acts apply) is to be determined by arbitration, then, unless otherwise provided, the difference shall be referred to, and settled by, a single arbiter to be agreed between the parties or, failing agreement, to be appointed, on the application of either party (after notice in writing to the other), by the President for the time being of the Institution of Civil Engineers.

(2)An arbiter appointed under this section shall be entitled to state a case for the opinion of the Court of Session pursuant to section 3 of the Administration of Justice (Scotland) Act 1972 (c. 59).

(3)Section 108 of the 1996 Act (right to refer disputes to adjudication) and any regulations made under that section shall not apply to any dispute under this Act (whether or not it is a dispute of the sort described in subsection (1) above).

(4)Subsection (3) above does not affect the operation of the 1996 Act so far as applicable to any contract under which a contracting party other than the authorised undertaker is responsible for the construction or funding of the authorised works.

(5)In this section “the 1996 Act” means the Housing Grants, Regeneration and Construction Act 1996 (c. 53).

35Service of notices, etc.S

(1)A notice or other document required or authorised to be served on a person for the purposes of this Act may be served—

(a)by delivering it to that person;

(b)by leaving it at that person's proper address; or

(c)by sending it by post to that person at that address.

(2)A notice or document is duly served on a body corporate or a firm—

(a)in the case of a body corporate if it is served on the secretary or clerk of that body; and

(b)in the case of a firm, if it is served on a partner of that firm.

(3)For the purposes of subsection (1) above and of paragraph 4 of Schedule 1 to the Scotland Act 1998 (Transitory and Transitional Provisions) (Publication and Interpretation etc. of Acts of the Scottish Parliament) Order 1999 (S.I. 1999/1379), a letter is properly addressed to—

(a)a body corporate, if addressed to the body at its registered or principal office;

(b)a firm, if addressed to the firm at its principal office; or

(c)any other person, if addressed to the person at that person's last known address.

(4)Where for the purposes of this Act a notice or other document is required or authorised to be served on a person as having any interest in, or as the occupier of, land and the person's name or address cannot be ascertained after reasonable enquiry, the notice may be served by—

(a)addressing it to the person by name or by the description of “owner”, or as the case may be “occupier”, of the land (describing it); and

(b)either leaving it in the hands of a person who is or appears to be resident or employed on the land or leaving it conspicuously affixed to some building or object on or near the land.

(5)This section shall not be taken to exclude the employment of any method of service not expressly provided for by it.

36Listed buildings and conservation areasS

Schedule 9 to this Act (which makes provision for the disapplication or modification, in relation to the authorised works, of controls relating to listed buildings and buildings in conservation areas) shall have effect.

37Saving for town and country planningS

(1)The 1997 Act and any orders, regulations, rules, schemes and directions made or given thereunder and any restrictions or powers thereby imposed or conferred in relation to land shall apply and may be exercised in relation to any land notwithstanding that the development of that land is or may be authorised or regulated by or under this Act.

(2)In their application to development authorised by this Act, article 3 of, and Class 29 in Part 11 of Schedule 1 to, the Town and Country Planning (General Permitted Development) (Scotland) Order 1992 (S.I. 1992/223) (which permit development authorised by (among other enactments) any Act of the Parliament which designates specifically both the nature of the development thereby authorised and the land upon which it may be carried out) shall have effect as if the authority to develop given by this Act were limited to development begun within 10 years after the date on which this Act comes into force.

(3)Subsection (2) above shall not apply to the carrying out of any development consisting of the alteration, maintenance or repair of the authorised works or the substitution of new works therefor.

38Interpretation of sections 39 and 40S

(1)In sections 39 and 40 below—

  • currency”, in relation to a financial support contract, means the period during which—

    (a)

    a financial support contract is in force; and

    (b)

    financial obligations under the financial support contract relating to the provision of the authorised works remain to be discharged;

  • developer contribution” means a developer contribution obtained under section 39(4) below;

  • financial support contract” means—

    (a)

    an agreement under which a party to the agreement makes a commitment to—

    (i)

    procure funding for the provision of the authorised works;

    (ii)

    approve any of the relevant planning authorities incurring expenditure or entering into any financial obligation for that purpose;

    (b)

    a contract under which a party to the contract is obliged to provide money to pay for providing the authorised works and the authorised undertaker is obliged to pay interest or otherwise give monetary consideration for that money; or

    (c)

    a contract under which a party to the contract is obliged to provide, or to procure the provision of, all or part of the authorised works for a consideration all or part of which is represented by the transfer or grant to that person of assets or benefits in either case other than money;

  • provision”, in relation to any part of the railway works, means the design, construction or financing of those works, and includes maintenance and operation so far as provided in conjunction with design, construction or financing; and

  • relevant planning agreement” means an agreement entered into by a planning authority under section 75 of the 1997 Act in connection with land on which any development can be expected to benefit from or be enhanced by the provision of the authorised works.

(2)For the purposes of subsection (1) above and of sections 39 and 40 below the relevant planning authorities are Scottish Borders Council, Midlothian Council and City of Edinburgh Council.

39Planning agreementsS

(1)Section 75 of the 1997 Act, section 69 of the Local Government (Scotland) Act 1973 (c. 65) and Part 3 of the Local Government in Scotland Act 2003 (asp 1) shall, in their application to the relevant planning authorities, have effect in accordance with the following provisions of this section.

(2)Subject to subsections (5) to (8) below, a relevant planning agreement may include provision relating to, or to development supporting, or otherwise connected with, the authorised works.

(3)A relevant planning authority shall not be precluded from entering into a relevant planning agreement which includes provision relating to, or to development supporting, or otherwise connected with, the authorised works by reason only of the fact that all or some of the authorised works are located outwith the local government area of the planning authority concerned.

(4)Subject to subsections (5) to (8) below, in any relevant planning agreement made pursuant to this section financial provisions relating to the authorised works may require the payment of developer contributions towards the cost of providing the authorised works or any development relating to, supporting or otherwise connected with the authorised works.

(5)The developer contributions obtained by the relevant planning authorities towards the cost of providing the authorised works shall not in aggregate exceed the total of the sums necessary for the purpose of providing the authorised works.

(6)No developer contribution under subsection (4) above shall be required more than 30 years after the opening of the railway works for public use.

(7)For the purposes of this section and section 40 below the sums necessary for the purpose of providing the authorised works include all sums from time to time payable for that purpose, and (without prejudice to that generality) include interest payments, loan charges and sums payable under or in consequence of any financial support contract.

(8)Accordingly, developer contributions may be required at any time during the currency of a loan agreement or a financial support contract.

(9)A requirement for developer contributions does not amount to the raising of money by making a levy or imposition within the meaning of section 22(7) of the Local Government in Scotland Act 2003 (asp 1).

40Application of developer contributionsS

(1)A relevant planning authority shall secure that any developer contribution it obtains towards the cost of providing the authorised works is (whether by payment to the authorised undertaker or otherwise) applied for the purpose of providing the authorised works.

(2)A developer contribution that is not within 12 months of its receipt by the relevant planning authority applied as required by subsection (1) above shall on the expiry of that period be repayable to the person from whom it was obtained.

41Blighted landS

(1)This Act shall be deemed to be a special enactment for the purposes of paragraph 14 of Schedule 14 to the 1997 Act.

(2)Accordingly, Chapter II of Part V of that Act (which makes provision for the purchase of certain interests in land affected by planning proposals) shall apply to land authorised to be compulsorily acquired under this Act.

42Method of vesting landS

(1)Section 195 of, and Schedule 15 to, the 1997 Act shall apply to the compulsory acquisition of land under this Act as if this Act were a compulsory purchase order so as to enable the authorised undertaker to vest by general vesting declaration any land authorised to be compulsorily acquired under this Act.

(2)The notice required by paragraph 2 of that Schedule (as so applied) shall be a notice—

(a)that this Act has received Royal Assent;

(b)containing the particulars specified in sub-paragraph (1) of that paragraph;

(c)published and served in accordance with the requirements of paragraph 6 of Schedule 1 to the Acquisition of Land (Authorisation Procedure) (Scotland) Act 1947 (c. 42); and

(d)given at any time after this Act comes into force.

43Certification of plans, etc.S

(1)As soon as practicable after the coming into force of this Act, the authorised undertaker shall submit copies of the book of reference, the Parliamentary plans and the Parliamentary sections to the Clerk of the Parliament for certification under this section.

(2)On being satisfied as to the accuracy of documents submitted under subsection (1) above, the Clerk shall certify them as being, respectively the book of reference, Parliamentary plans and Parliamentary sections referred to in this Act.

(3)A document certified under subsection (2) above shall be admissible in any proceedings as evidence of the contents of the document of which it is a copy.

44Registration of new rightsS

(1)A servitude or other right acquired by the authorised undertaker under section 14 or 15 above shall, unless otherwise expressly stated in the instrument by which it is created, be treated for all purposes as benefiting the land from time to time held by the authorised undertaker for the purposes of the authorised works.

(2)Notwithstanding section 75 of the Title Conditions (Scotland) Act 2003 (asp 9), where a servitude falls to be treated as mentioned in subsection (1) above, the deed by which it is created shall be effective whether or not it is registered against the benefited property.

45Mitigation of environmental impactsS

(1)The authorised undertaker shall employ all reasonably practicable means to ensure—

(a)that the environmental impacts of the construction and operation of the authorised works are not worse than the residual impacts identified in the environmental statement; and

(b)that—

(i)the additional environmental mitigation measures identified in the promoter's undertakings are carried out; or

(ii)the environmental impacts of the construction or operation of the authorised works are not worse than they would have been had the mitigation measures referred to in sub-paragraph (i) been carried out.

(2)In this section—

  • environmental statement” means the environmental statement submitted to the Parliament as an accompanying document with the Bill for this Act, as amended by “Waverley Railway Act: Further Environmental Information (February 2005)” and the “Addendum Environmental Statement: Stow Station (January 2006)”;

  • the promoter's undertakings” means all undertakings given by Scottish Borders Council as Promoter of the Bill for this Act—

    (a)

    to the Committee during the Consideration Stage of the Bill for this Act; or

    (b)

    to any person in connection with that Bill;

  • residual impacts” means the environmental impacts of the construction or operation of the authorised works after the mitigation measures proposed in the environmental statement have been carried out.

46Compliance with Code of Construction Practice and Noise and Vibration PolicyS

(1)The authorised undertaker shall employ all reasonably practicable means to ensure that—

(a)the authorised works are carried out in accordance with—

(i)the code of construction practice; and

(ii)any relevant local construction code,

as approved by the local planning authority and from time to time amended or replaced; and

(b)the noise and vibration policy, as from time to time amended or replaced, is applied to the use and operation of the authorised works.

(2)Neither the code of construction practice nor the noise and vibration policy shall be amended or replaced so as to reduce the standards of mitigation and protection provided for in the versions being amended or replaced.

(3)Schedule 10 has effect in relation to the approval, amendment, replacement and effect of the code of construction practice.

(4)In this section “noise and vibration policy” means the “Policy Paper on behalf of the Promoter in respect of Noise and Vibration” dated 28th November 2005, a copy of which has been lodged with the Clerk of the Parliament to be held with the accompanying documents relating to the Bill for this Act.

47Works affecting the River Tweed Special Area of ConservationS

(1)This section has effect in relation to the construction of the specified works, namely—

(a)Works Nos. 5, 5D, 6, 7, 7B, 8, 9 and 10; and

(b)all related works and operations.

(2)Paragraphs 2 to 7 of Part 1 of schedule 11 to this Act shall have effect in relation to the construction of the specified works at the sites identified in paragraph 1 of that Part.

(3)Regulation 60 of the Conservation (Natural Habitats, etc.) Regulations 1994 (SI 1994/2716) shall not apply to the works and operations described in Parts 1 and 2 of schedule 11 to this Act to the extent to which they have been the subject of appropriate assessment by the Scottish Parliament prior to the passing of the Bill for this Act.

48Regulation of mitigation measuresS

(1)The requirements imposed by or pursuant to the following provisions, that is to say—

(a)sections 45, 46 and 47 above;

(b)schedules 10 and 11 to this Act;

(c)any agreement under paragraph 6 of schedule 11; and

(d)any code of construction practice or local construction code approved, amended or replaced under either of those schedules,

shall be enforceable, and the local planning authority shall have the duty to enforce them, as valid planning conditions.

(2)For the purpose only of such enforcement, planning permission for the construction of the authorised works shall be deemed to have been granted under section 37 of the 1997 Act subject to the imposition of those conditions under section 41 of that Act.

(3)The local planning authority shall appoint an Environmental Clerk of Works to monitor the carrying out by the authorised undertaker of the measures referred to in subsection (1).

49Application of the Crichel Down RulesS

In the event that the authorised undertaker compulsorily acquires land as authorised by section 13 above and that land is subsequently declared by the authorised undertaker to be surplus to the authorised undertaker's requirements for the provision of the authorised works, the authorised undertaker shall apply the rules set out in Scottish Development Department Circular 38 of 1992 (“Disposal of Surplus Government Land – the Crichel Down Rules”) as may be amended or superseded from time to time.

50Application of original enactmentsS

(1)The provisions of the original enactments mentioned in schedule 12 to this Act shall apply to the authorised works as though for references in those provisions to any former railway there were substituted references to the whole or any part of the authorised works and as if any reference to the railway undertaker (however described) were a reference to the authorised undertaker.

(2)Except as provided in subsection (1) above, nothing in this Act shall have the effect of applying the original enactments to the authorised works.

(3)As from—

(a)the acquisition of any land by the authorised undertaker, whether compulsorily or by agreement; or

(b)the entry on the land by the authorised undertaker under section 24 above,

whichever is sooner, BRBR shall be discharged from any obligation to which it is subject in relation to that land under any statutory provision relating to the former railway.

(4)In this section “BRBR” means BRB (Residuary) Limited (company no. 04146505) and its successors.

51Rights of the Scottish MinistersS

(1)Nothing in this Act affects prejudicially any estate, right, power, privilege, authority or exemption of the Scottish Ministers.

(2)Without prejudice to the generality of subsection (1) above, nothing in this Act authorises the acquisition of land (including any rights or interests in land) belonging to the Scottish Ministers without their consent in writing.

(3)A consent under subsection (2) above may be given unconditionally or subject to terms and conditions.

Part 4 SSupplementary

52Incorporation of enactmentsS

(1)The following enactments (so far as applicable for the purposes of and not inconsistent with, or varied by, the provisions of this Act) are incorporated with this Act—

(a)the Lands Clauses Acts, except sections 120 to 124 and section 127 of the 1845 Lands Act;

(b)the 1845 Act, except sections 1, 7, 8, 9, 15, 17, 19, 20, 22, 23 and 25; and

(c)in the Railways Clauses Act 1863 (c. 92), Part I (relating to construction of a railway) except sections 13, 14 and 19.

(2)This Act shall be deemed to be the special Act for the purposes of the enactments incorporated by subsection (1) above.

53InterpretationS

(1)In this Act—

  • the 1845 Act” means the Railways Clauses Consolidation (Scotland) Act 1845 (c. 33);

  • the 1845 Lands Act” means the Lands Clauses Consolidation (Scotland) Act 1845 (c. 19);

  • the 1963 Act” means the Land Compensation (Scotland) Act 1963 (c. 51);

  • the 1991 Act” means the New Roads and Street Works Act 1991 (c. 22);

  • the 1997 Act” means the Town and Country Planning (Scotland) Act 1997 (c. 8);

  • the ancillary works” has the meaning given by section 3 above;

  • the authorised undertaker” means, at any time, Scottish Borders Council or such other person or persons in whom are vested at that time some or all of the functions conferred by this Act concerning the authorised works;

  • the authorised works” means the works authorised by this Act;

  • book of reference” means the book of reference submitted to the Parliament as an accompanying document with the Bill for this Act, together with the volume entitled “Book of Reference – Stow Station”, which was submitted to the Committee in connection with the Bill for this Act, a copy of which has been lodged with the Clerk of the Parliament to be held with the accompanying documents relating to the Bill for this Act;

  • code of construction practice” means the edition of the Code of Construction Practice (which sets out the measures to be employed in the construction of the authorised works so to mitigate the impact of those works) Version 7 dated 28th April 2006, a copy of which has been lodged with the Clerk of the Parliament to be held with the accompanying documents relating to the Bill for this Act;

  • the Committee” means the Waverley Railway (Scotland) Bill Committee to which the Bill for this Act was referred;

  • construction” includes execution, placing, alteration and reconstruction and demolition; and “construct” and “constructed” have corresponding meanings;

  • the continuing private crossings” has the meaning given by section 8(1) above;

  • enactment” includes any order, byelaw, rule, regulation, scheme or other instrument having effect by virtue of an enactment;

  • the existing private crossings” has the meaning given by section 8(2) above;

  • the former railway” means any railway which prior to the passing of this Act was situated within the limits of deviation;

  • the limits of deviation” means the limits so described on the Parliamentary plans;

  • the limits of land to be acquired or used” means the limits so described on the Parliamentary plans;

  • local construction code” means a code of practice intended to define, and from time to time redefine, the authorised undertaker's policy in relation to construction practice to be adopted in the carrying out of the authorised works within an area specified in that code;

  • Network Rail” means Network Rail Infrastructure Limited (Company No. 2904587 (England)) whose registered office is at 40 Melton Street, London NW1 2EE and any other of the Network Rail group of companies which holds property for railway purposes;

  • the original enactments” means any enactment by which any former railway was authorised, and any other enactment of local application relating to any former railway;

  • Parliamentary plans” means the plans submitted to the Parliament as accompanying documents with the Bill for this Act, together with the Stow maps, plans and sections;

  • Parliamentary sections” means the sections submitted to the Parliament as accompanying documents with the Bill for this Act;

  • the railway works” has the meaning given by section 2 above;

  • River Tweed Special Area of Conservation” means the special area of conservation designated, under Directive 92/43/EEC on the Conservation of Natural Habitats and of Wild Flora and Fauna, with the SAC EU Code UK 0012691;

  • road” has the meaning given by section 107 of the 1991 Act;

  • the road works authority” has the meaning given by section 108 of the 1991 Act;

  • the roads authority” has the meaning given by section 151(1) of the Roads (Scotland) Act 1984 (c. 54);

  • SEPA” means the Scottish Environment Protection Agency established under section 20 of the Environment Act 1995 (c. 25);

  • SNH” means Scottish Natural Heritage established under section 1 of the Natural Heritage (Scotland) Act 1991 (c. 28);

  • Stow maps, plans and sections” means the volume of the Parliamentary plans entitled “Maps, Plans and Sections – Stow Station”, which was submitted to the Committee in connection with the Bill for this Act, a copy of which has been lodged with the Clerk of the Parliament to be held with the accompanying documents relating to the Bill for this Act;

  • Stow plan” means the plan forming part of the Stow maps, plans and sections; and

  • the tribunal” means the Lands Tribunal for Scotland.

(2)Except in relation to section 4 above, all directions, distances and lengths stated in any description of works, powers or lands in this Act shall be construed as if the words “ or thereby ” were inserted after each such direction, distance and length.

54Short titleS

This Act may be cited as the Waverley Railway (Scotland) Act 2006.

SCHEDULE 1SRailway works

(introduced by section 2)

In the local government areas of Midlothian and Scottish Borders a railway from the Millerhill Marshalling Yard in Midlothian to Tweedbank in Scottish Borders substantially following the route of the former Waverley railway, including stations at Shawfair, Eskbank, Newtongrange, Gorebridge, Stow, Galashiels and Tweedbank, and comprising—

In the local government area of Midlothian—

Railway between the Millerhill Marshalling Yard and Old Dalkeith Road—

  • Work No. 1—A railway (3,600 metres in length) commencing by joining the Niddrie North Junction-Bilston Glen line (Edinburgh CrossailRail to Newcraighall) at a point in the Millerhill Marshalling Yard 7 metres south-west of the south-western corner of the bridge carrying Whitehall Road over the northern rail entrance to the Millerhill Marshalling Yard and terminating at a point 50 metres north of the bridge carrying Old Dalkeith Road (A68) over the Penicuik-Musselburgh Foot & Cycleway. Work No. 1 includes a bridge under the City of Edinburgh Bypass (A720) and a culvert to carry Dean Burn under the intended railway. Work No. 1 includes a station at Shawfair.

  • Work No. 1A—A bridge over the intended railway (Work No. 1) to provide access for the proposed Shawfair development.

  • Work No. 1B—An access road commencing by a junction with Work No. 1C at a point 117 metres south-west of the entrance to the CPL Distribution Depot on the unnamed road forming the western continuation of Newton Church Road and terminating at that entrance.

  • Work No. 1C—A realignment of the unnamed road forming the western continuation of Newton Church Road and of Newton Church Road commencing at a point in that unnamed road 190 metres south-west of the entrance to the CPL Distribution Depot on the unnamed road, passing over the intended railway (Work No. 1) and terminating at a point 195 metres north-east of the north-eastern corner of Hope Cottage. Work No. 1C includes a bridge over the intended railway (Work No. 1).

  • Work No. 1D—A road commencing by a junction with Work No. 1C at a point 200 metres north-east of the north-eastern corner of Hope Cottage and terminating by a junction with Newton Church Road at a point 110 metres north-east of the north-eastern corner of Hope Cottage.

  • Work No. 1E—A footbridge over the intended railway (Work No. 1) to provide access for the proposed station at Shawfair.

  • Work No. 1F—A footbridge over the intended railway (Work No. 1) at Longthorn between the junction of Newton Village with Newton Church Road and a point 105 metres south-east of the south-eastern corner of Hope Cottage.

  • Work No. 1G—A road commencing by a junction with Millerhill Road (A6106) and the commencement of Work No. 1J, at a point 222 metres west of the roundabout at the junction of that road and Old Craighall Road (B6415), passing over the intended railway (Work No. 1) and terminating at a point 253 metres north of that roundabout. Work No. 1G includes a bridge over the intended railway (Work No. 1).

  • Work No. 1H—A road commencing by a junction with Work No. 1G at a point 235 metres north of the roundabout at the junction of Millerhill Road (A6106) and Old Craighall Road (B6415) and terminating by a junction with Old Craighall Road at a point 160 metres north-east of that roundabout.

  • Work No. 1J—A realignment of Millerhill Road (A6106) commencing by a junction with that road at the commencement of Work No. 1G and terminating by a junction with Millerhill Road at a point 215 metres south of the access road leading to Sheriffhall Mains.

  • Work No. 1K—A road commencing by a junction with the access road leading to Sheriffhall Mains at a point 340 metres south of the roundabout at the junction of Millerhill Road (A6106) and Old Craighall Road (B6415) and terminating by a junction with Work No. 1J at a point 282 metres south-west of that roundabout. Work No. 1K includes a bridge over the intended railway (Work No. 1).

Railway between Old Dalkeith Road and the Butlerfield Industrial Estate—

  • Work No. 2—A railway (4,800 metres in length) commencing by a junction with Work No. 1 at its termination, passing in part over the course of the former Waverley railway and terminating at a point 68 metres north of the northern side of Brewer's Bush Bridge carrying New Hunterfield (B704) over the intended railway. Work No. 2 includes the strengthening of Glenesk Viaduct carrying the intended railway over the river North Esk; the removal of the existing footbridge at the former Eskbank Station; the reconstruction of Hardengreen Farm Bridge carrying the track to that farm over the intended railway; a viaduct carrying the intended railway over Murderdean Road (A7) and the B6392 road at Hardengreen Junction and the strengthening of Newbattle Viaduct carrying the intended railway over the river South Esk. Work No. 2 includes stations at Eskbank and Newtongrange.

  • Work No. 2A—A footbridge over the intended railway (Work No. 2) to provide access to the proposed station at Eskbank.

  • Work No. 2B—An access road commencing by a junction with the private service road off the Tesco car park at a point 40 metres south-east of the entrance to the Tesco Petrol Station at Hardengreen and terminating in the proposed station car park at Eskbank at a point 197 metres east of that entrance.

  • Work No. 2C—A road commencing by a junction with the access road (Work No. 2B) at a point 75 metres south-east of the entrance to the Tesco Petrol Station at Hardengreen and terminating at the goods entrance to Tesco at a point 75 metres east of that entrance.

  • Work No. 2D—A road commencing by a junction with the access road (Work No. 2B) at a point 142 metres south-east of the entrance to the Tesco Petrol Station at Hardengreen and terminating at the entrance to K&I Coachworks at a point 140 metres south-east of that entrance.

  • Work No. 2E—A footbridge over the intended railway (Work No. 2) at Newtongrange between Redwood Walk and Station Road.

  • Work No. 2F—A footbridge over the intended railway (Work No. 2) at Deanpark between New Star Bank and Station Road.

Railway between Butlerfield Industrial Estate and Borthwick Mains Cottages—

  • Work No. 3—A railway (5,900 metres in length) commencing by a junction with Work No. 2 at its termination, passing over the course of the former Waverley railway and terminating at a point 70 metres east of the eastern side of Thorniehill Bridge carrying Castle Road over the intended railway. Work No. 3 includes a viaduct carrying the intended railway over the A7 road at Gore Glen Country Park; the removal of Harvieston South Footbridge at the former Fushiebridge station; a station at Gorebridge; and an overbridge at Catcune Farm.

  • Work No. 3A—A footbridge over the intended railway (Work No. 3) at Gore Glen Country Park (west) between the Country Park's existing footpath network and the Country Park's car park adjacent to the A7 road.

  • Work No. 3B—A footbridge over the intended railway (Work No. 3) at Gore Glen Country Park (east) to carry the path between the Country Park's existing footpath network and Millbank House over Work No. 3.

  • Work No. 3C—A railway (346 metres in length), forming a turnback siding at Gorebridge, commencing at a point 322 metres south-east of the south-eastern corner of Millbank House and terminating by a junction with the intended railway (Work No. 3) at a point 230 metres west of the bridge carrying Main Street/Station Road over Work No. 3.

  • Work No. 3D—A footbridge over the intended railway (Work No. 3) at Gorebridge to carry the path between Robertson's Bank and Vogrie Road over Work No. 3.

In the local government areas of Midlothian and Scottish Borders—

Railway between Borthwick Mains Cottages and Cowbraehill—

Work No. 4—A railway (5,100 metres in length) commencing by a junction with Work No. 3 at its termination, passing over the course of the former Waverley railway and terminating at a point 267 metres south-east of the junction of the track leading to Steading Cottage/Cowbraehill with the B6367 road. Work No. 4 includes the reconstruction of the Halflaw Kiln Overbridge, the Halflaw Bow's Overbridge and the bridge carrying the track between the B6367 road and Halflaw Kiln over the intended railway; and the removal of the existing Willow Burn Bridge.

Railway between Cowbraehill and Stagebank—

Work No. 5—A railway (5,000 metres in length) commencing by a junction with Work No. 4 at its termination, passing over the course of the former Waverley railway and terminating at a point 150 metres south-east of the former Stagebank level crossing. Work No. 5 includes the replacement of the decking of the unnamed culverts carrying Cakemuir Burn and Gala Water under the intended railway; the reconstruction of Shoestanes Overbridge over the intended railway; and the replacement of the decking of Heriot Station culvert carrying Gala Water and Shoestanes culvert carrying Shoestanes Burn under the intended railway.

In the local government area of Scottish Borders—

  • Work No. 5A—A realignment of the A7 road commencing at a point in that road 120 metres north of the existing junction of the private road leading to Falahill Farm with the A7 road and terminating at a point in the A7 road adjacent to No. 6 Falahill Cottages. Work No. 5A includes a bridge over the intended railway (Work No. 5).

  • Work No. 5B—A road commencing by a junction with Work No. 5A at a point 70 metres south of the existing junction of the private road leading to Falahill Farm with the A7 road and terminating by a junction with that private road at a point 120 metres south-west of that existing road junction.

  • Work No. 5C—A footbridge over the intended railway (Work No. 5) at the former Heriot Station to replace the length of Heriot Way between points E3 and E4.

  • Work No. 5D—A road commencing by a junction with the B709 road at a point 120 metres south of the existing junction of Old Stage Road (C11) with the B709 and terminating by a junction with the A7 road at a point 233 metres north-east of that existing road junction. Work No. 5D includes a bridge over the intended railway (Work No. 5) and earthworks for a visibility splay at its junction with the A7 road. Work No. 5D also includes a diversion of Gala Water from its existing course between points E7, E8 and E10 to a new course between points E7, E9 and E10.

  • Work No. 5E—A road commencing by a junction with Work No. 5D at a point 33 metres north of the existing junction of Old Stage Road (C11) with the B709 road and terminating by a junction with the B709 75 metres north-west of that existing road junction.

  • Work No. 5F—A road commencing by a junction with Work No. 5D at a point 40 metres south of the existing junction of Old Stage Road (C11) with the B709 road and terminating by a junction with Old Stage Road 130 metres south-east of that road junction.

  • Work No. 5G—An improvement of the Hangingshaw branch of the C11 road between a point 112 metres south of the junction of that branch road with the A7 road and the junction with Old Stage Road (C11). Work No. 5G includes a bridge over the intended railway (Work No. 5).

Railway between Stagebank and Hazelbank Quarry—

Work No. 6—A railway (3,300 metres in length) commencing by a junction with Work No. 5 at its termination, passing over the course of the former Waverley railway and terminating at a point 63 metres south of the bridge carrying the former railway over Gala Water. Work No. 6 includes the replacement of the decking of Hangingshaw Cattle Creep under the intended railway and of Little Gala, Crookston Mill, Hollowshank and Bower bridges carrying the intended railway over Gala Water.

Railway between Hazelbank Quarry and Stow—

  • Work No. 7—A railway (7,000 metres in length) commencing by a junction with Work No. 6 at its termination, passing over the course of the former Waverley railway and terminating at a point 158 metres north-west of the bridge carrying Station Road over the former railway at Stow. Work No. 7 includes a new culvert with track at Fountainhall to carry Still Burn under the intended railway; the reconstruction of Plenploth North, Torquhan South and Watherston bridges to carry the intended railway over Gala Water; the replacement of the decking of the culvert carrying a cattle creep and drain under the railway at Pirn and the culvert carrying Dean Burn under the railway at Watherston; the reconstruction of Craigbank Cattle Creep and of Watherston Dry Underbridge carrying the intended railway over the access track between the A7 road and Watherston Farm at The Craigs Wood; and the replacement of the decking of the bridge to carry the intended railway over Gala Water at Galabank.

  • Work No. 7A—A road commencing by a junction with the Fountainhall branch of the C11 road at a point 210 metres north-west of the junction of that branch road with Old Stage Road (C11) and terminating by a junction with the A7 road at a point 86 metres north-west of the junction of the Fountainhall branch of the C11 with the A7 road. Work No. 7A includes a bridge over the intended railway (Work No. 7) and earthworks for a visibility splay at its junction with the A7.

  • Work No. 7B—An access road commencing by a junction with Work No. 7A at a point 100 metres south-west of the junction of the Fountainhall branch of the C11 with the A7 road and terminating by a junction with the private road leading to Allanshaugh at a point 187 metres north-east of the junction of that road with Old Stage Road (C11).

Railway between Stow and Bowland Bridge—

  • Work No. 8—A railway (5,400 metres in length) commencing by a junction with Work No. 7 at its termination, passing over the course of the former Waverley railway, through the existing Bowshank Tunnel and terminating at a point 216 metres south-east of the bridge (Bowland Bridge) carrying the former railway over the Caddonfoot to Bowland road (B710). Work No. 8 includes a station at Stow; the replacement of the decking of the bridges carrying the intended railway over Lugate Water and Ferniehirst Dry; the replacement of the decking of Ferniehirst Water and Bowshank South bridges carrying the intended railway over Gala Water and the bridge (Bowland Bridge) carrying the intended railway over the Caddonfoot to Bowland road (B710); the replacement of the decking of the sheep and cattle creeps under the intended railway at Lugate Dry, Ferniehirst Dry and Bow Bridge; the improvement of Bowshank Tunnel; and the removal of Bowshank Farm Bridge over the intended railway.

  • Work No. 8A—A realignment of the Bow branch of the C11 road between a point 130 metres south-west of the junction of that branch road with the A7 road and a point 130 metres north-east of the junction of that branch road with Old Stage Road (C11). Work No. 8A includes a bridge under the intended railway (Work No. 8).

  • Work No. 8B—A footbridge over the intended railway (Work No. 8) to provide access to the station at Stow.

Railway between Bowland Bridge and Torwoodlee—

Work No. 9—A railway (3,300 metres in length) commencing by a junction with Work No. 8 at its termination, passing over the course of the former Waverley railway, through the existing Torwoodlee Tunnel and terminating at a point 80 metres south of the southern portal of the Torwoodlee Tunnel. Work No. 9 includes the replacement of the decking of Whitelee Culvert carrying Halk Burn under the intended railway; the replacement of the decking of Whin Underbridge carrying the intended railway over Gala Water at Robin's Knowe; the replacement of the decking of Torwoodlee Cattle Creep under the intended railway; and a bridge (Torwoodlee Water Underbridge) to carry the intended railway over Gala Water at Torwoodlee.

Railway between Torwoodlee and Tweedbank—

  • Work No. 10—A railway (5,780 metres in length) commencing by a junction with Work No. 9 at its termination, passing over the course of the former Waverley railway and terminating at a point 35 metres north of the junction of the Tweedbank Industrial Estate Road with Tweedbank Drive. Work No. 10 includes bridges to carry the intended railway over Gala Water at Torwoodlee and over Wheatlands Road (DG108); the reconstruction of the bridge carrying the intended railway over Gala Water adjacent to Plumtreehall Brae (DG84); a station at Galashiels; the removal of the existing Station Brae Bridge; bridges to carry the intended railway over the Langhaugh Industrial Estate Road (DG125/2), the access road (Work No. 10H), Glenfield Road West (DG39) and the path between Glenfield Road East and Huddersfield Street; a bridge to carry Winston Road over the intended railway; and a station at Tweedbank.

  • Work No. 10A—A footbridge over the intended railway (Work No. 10) to replace the length of Plumtreehall Brae (DG84) between a point 75 metres south-west of the junction of that road with Magdala Terrace (A7) and a point 95 metres south of that road junction.

  • Work No. 10B—A reconstruction of the bridge carrying Plumtreehall Brae (DG84) over Gala Water north-east of the junction with King Street (A72).

  • Work No. 10C—A footbridge over the intended railway (Work No. 10) to replace the length of the unnamed road between High Buckholmside (A7) and Low Buckholmside (DG68) between a point 50 metres south of the junction of that unnamed road with High Buckholmside and a point 8 metres north of the junction of the unnamed road with Low Buckholmside.

  • Work No. 10D—A road commencing by a junction with Work No. 10E at a point 75 metres east of the junction of Station Brae (B6374) with Market Street (A7) and terminating by a junction with Station Brae at a point 30 metres north-west of the junction of that road with High Road (B6452). Work No. 10D includes a bridge over the intended railway (Work No. 10).

  • Work No. 10E—A road commencing in Currie Road (DG125/2) at a point 60 metres east of its junction with Ladhope Vale (A7) and terminating by a junction with Currie Road (DG125/2) at a point 40 metres north-west of the junction with Currie Road of the entrance to the Health Centre and public car park.

  • Work No. 10F—An access road commencing at the junction of Station Brae (B6374) with Market Street (A7) and terminating at the entrance to the car park adjoining Our Lady and St Andrew Church.

  • Work No. 10G—An access road commencing by a junction with Work No. 10F at a point 12 metres north-east of the junction of Station Brae (B6374) with Market Street (A7) and terminating at the entrance to the car park adjoining Anderson's Chambers.

  • Work No. 10H—An access road commencing by a junction with Glenfield Road West (DG39) at a point 180 metres south-east of the junction of the Langhaugh Industrial Estate Road (DG125/2) with Currie Road (DG125/2) and terminating at a point 190 metres south-east of that road junction.

  • Work No. 10J—A footbridge over the intended railway (Work No. 10) to replace a length of the path between Dale Street (DG15) and Langlee Drive (DG60).

  • Work No. 10K—An access road commencing at a point in the proposed station car park at Tweedbank 65 metres north of the existing junction of the Tweedbank Industrial Estate Road with Tweedbank Drive and terminating at a point 12 metres south of that existing road junction.

  • Work No. 10L—An improvement of Tweedbank Drive between a point in that road 25 metres north-west of the existing junction of the Tweedbank Industrial Estate Road with Tweedbank Drive and a point in Tweedbank Drive 40 metres south-east of that existing road junction.

SCHEDULE 2SAncillary works

(introduced by section 3)

1SStations, buildings, platforms, junctions and stopping places.

2SBridges, subways, stairs, lifts, escalators, roundabouts and means of access.

3SJunctions and communications with, and widening of, any road, path or way.

4SWorks for the provision of apparatus, plant or machinery and for the accommodation of such works, including mains, sewers, pipes, drains, cables, lights, conduits and culverts.

5SWorks for the strengthening, underpinning, protection, alteration or demolition of any building or structure.

6SWorks or operations to stabilise the condition of any land or for the purposes of flood prevention.

7SWorks to alter the course of, or otherwise interfere with, non-navigable rivers, streams or watercourses.

8SWorks to alter the position of any existing apparatus or any existing street furniture, including the alteration of the position of existing works of the sort described in paragraph 4 above.

9SWithout prejudice to the generality of paragraph 8 above, works to alter the position of any railway track or other railway apparatus.

10SLandscaping, ecological and other works to mitigate any adverse effects of the construction, maintenance or operation of the authorised works.

11SWorks for the benefit or protection of premises affected by the authorised works.

12SThe removal by the authorised undertaker of any works constructed by it pursuant to this Act which have been constructed as temporary works or which it no longer requires.

13SSuch other works (of whatever nature) as may be necessary or expedient for the purposes of, in connection with, or in consequence of, the construction of the authorised works.

SCHEDULE 3SPrivate crossings

(introduced by section 8)

Part 1 SContinuing private crossings

Local government area Sheet of Parliamentary plans Road
(1) (2) (3)
Midlothian 11 Dalhousie Mains private access
Midlothian 15 Redheugh private access
Midlothian 22 Overbridge, Catcune (part of Work No. 3)
Midlothian 22 Catcune Farm Underbridge
Midlothian 24 Borthwick Mains Overbridge
Midlothian 25 Halflaw Kiln Overbridge
Midlothian 26 Halflaw Bow's Overbridge
Midlothian 28 Willow Burn Overbridge
Midlothian 31 Old Moss Overbridge, Cowbraehill
Scottish Borders 35 Shoestanes Overbridge, Nettlingflat
Scottish Borders 39 Hangingshaw Cattle Creep, Hangingshaw
Scottish Borders 39 Little Gala Underbridge, Halftree
Scottish Borders 42 Crookston Mill Underbridge, Crookston
Scottish Borders 42 Hollowshank Underbridge, Crookston
Scottish Borders 43 Bower Underbridge, Hazelbank
Scottish Borders 44 Pirntaton Overbridge
Scottish Borders 44 Sheep creep carrying Still Burn, Fountainhall, under the intended railway
Scottish Borders 45 Access road to Allanshaugh, Fountainhall
Scottish Borders 47 Plenploth North Underbridge, Plenploth
Scottish Borders 48 Torquhan South Underbridge, Torquhan
Scottish Borders 48 Pirn Underbridge, Torquhan
Scottish Borders 50 Craigbank Cattle Creep
Scottish Borders 51 Watherston Underbridge, Watherston
Scottish Borders 52 Watherston Dry Underbridge, Watherston
Scottish Borders 52 Galabank Underbridge, Galabank
Scottish Borders 57 Lugate Dry Underbridge, Lugate
Scottish Borders 57 Lugate Water Underbridge, Lugate
Scottish Borders 58 Furniehurst Underbridge, Furniehurst
Scottish Borders 59 Furniehurst Water Underbridge, Furniehurst
Scottish Borders 59 Unnamed sheep creep, Bow Bridge
Scottish Borders 61 Harper's Overbridge, Dryburn
Scottish Borders 63 Whitelee Overbridge, Whitelee
Scottish Borders 64 Whin Overbridge, Whitelee
Scottish Borders 65 Whin Underbridge, Robin's Knowe
Scottish Borders 66 Torwoodlee Cattle Creep, Torwoodlee
Scottish Borders 66 Torwoodlee Road Overbridge, Torwoodlee
Scottish Borders 70 Torwoodlee Water Underbridge, Gala Water
Scottish Borders 70 Torwoodlee Culvert carrying Mill Lead, Torwoodlee
Scottish Borders 70 Culvert carrying Buckholm Mill Lade, Torwoodlee
Scottish Borders 70 Ryehaugh Dry Culvert, Torwoodlee
Scottish Borders 70 Ryehaugh Water Underbridge, Gala Water
Scottish Borders 71 Kilnknowe Farm Overbridge, Galashiels

Part 2 SPrivate crossings to be stopped up and discontinued

Local government area Sheet of Parliamentary plans Location
(1) (2) (3)
Midlothian 22 Existing overbridge, Catcune Farm
Scottish Borders 47 Unnamed crossing between Plenploth North Underbridge and Torquhan South Underbridge
Scottish Borders 51 Unnamed at grade crossing adjacent to Watherston Farm Cottage, Watherston
Scottish Borders 60 Bowshank Farm Overbridge, Bowshank
Scottish Borders 63 Unnamed at grade crossing at Bowland Wood

SCHEDULE 4SStopping up and diversion of roads

(introduced by sections 9 and 10)

Part 1 SRoads to be permanently stopped up

Sheet of Parliamentary plans Road to be stopped up Extent of stopping up Substitute to be provided or alternative
(1) (2) (3) (4)
In the local government area of Midlothian—
2 Track crossing former Monktonhall Colliery site Between points A1 and A2 No alternative
3 Road (unnamed)/Newton Church Road, Longthorn Between points A3 and A4 Works Nos. 1C and 1D
3 Newton Church Road, Longthorn Between points A5 and A7

Work No. 1F (pedestrians)

Works Nos. 1C and 1D and existing road network (vehicles)

4 Path between Longthorn and Wester Millerhill Between points A8 and A9 Work No. 1H and Old Craighall Road
4 Road (unnamed) to Sheriffhall Mains Between points A13 and A15a Work No. 1K
4, 5 Millerhill Road, Wester Millerhill Between points A12, A11, A13 and A14 Work No. 1J
4, 5 Road (unnamed) between Millerhill Road and Sheriffhall Mains Between points A15, A16 and A17 Works Nos. 1J and 1K
6 Path between Dean Burn/Dalkeith Country Park and A68 King's Gate overbridge Between points B3 and B2 No alternative
6 to 9 Track (Penicuik-Musselburgh Foot & Cycleway)

Between points B1 and B2

Between points B6, B7, B9, B11, B13, B17, B19 and B20

Track between points B4 and B5

Existing road and footpath network

7 Path between Glenesk Viaduct and High Woods, Ironmills Park Between points B5 and B6 Existing footpath network (Ironmills Park)
7 Track between Glenesk Viaduct (south end), former Dalkeith railway leading to Cemetery Road and former railway Between points B7, B8 and B9 Existing road and footpath network
7 Track between Garden Cottage (Viewpoint Housing Association, Avenue Road) and former railway Between points B10 and B11 No alternative
8 Track between Station Road and former railway Between points B12 and B13 No alternative
8 Path between Hardengreen Industrial Estate and Westfield Bank Between points B14 and B15 Work No. 2A, Hardengreen Lane and Westfield Park
9 Track between Hardengreen Lane and former railway Between points B16 and B17 Footpath between B16 and B16a and Work No. 2A
12 Track between Station Road and Redwood Walk Between points B27 and B28 Work No. 2E
12, 13 Track between Victoria Road and Deanpark Between points B25, B26 and B31 Victoria Road, track between points B28 and B30 and Work No. 2F
13 Track between Station Road and New Star Bank Between points B29 and B30 Work No. 2F
13 to 16 Path between Murderdean Road and Gore Glen Country Park Between points B32, C1, C2 and C3 No alternative
16 Track between A7 road and former Kirkhill Hotel Between points C3a and C3b Via Povert Road
16, 17 Paths, Gore Glen Country Park Between points C4, C3, C5 and C6, points C7 and C8 and points C9 and C10 Path between points C4, C7 and C10 and Work No. 3A
17 Path between Millbank House and Gore Glan Country Park footpath network Between points C13, C14 and C15 Work No. 3D
17 Path between Old Shank Bridge and Gorebridge (ROW 59) Between points C16 and C17 Path between points C13, C17 and C18
17 to 20 Path between Millbank House and Goreside Between points C14, C16, C19 and C20 Path between points C13, C17 and C18 and existing road network
20 Path at Goreside Between points C21 and C22 Work No. 3D
21 Harvieston South Footbridge (former Fushiebridge Station Footbridge) Between points C23 and C24 Fushiebridge Station Road bridge
22 Path at Catcune Between points C25 and C26 Bridge to be provided (part of Work No. 3)
28 Track between B6367 and Halflaw Kiln Between points D3, D6 and D5 Bridge to be provided (part of Work No. 4)
In the local government area of Scottish Borders—
33, 34 A7 road at Falahill Between points E1 and E2 Work No. 5A
34 Lay-by (A7) at Falahill Between points E2a and E2b Lay-by at Falahill between points X and Y
36 Heriot Way (B709), Heriot Between points E3 and E4 Works Nos. 5C, 5D and 5E and existing road network
36,37 B709 road and Old Stage Road (C11) Between points E11 and E12 and points E11 and E13 Works Nos. 5D, 5E and 5F
38 Path, former Stagebank Crossing, Stagebank Between points E7 and E8 No alternative
40 Track between Haltree and A7 road Between points F1 and F2 Existing road network
44 Road (C11 Fountainhall branch) between Old Stage Road and A7 road at Fountainhall Between points G1 and G2 Work No. 7A
57 Track between Torsonce Mains and Old Stage Road Between points H1 and H2 No alternative
59 Road (C11 Bow branch) between Old Stage Road and A7 road at Bow Bridge, Bow Between points H3 and H4 Work No. 8A
70, 71 Path between Gala Water and Wheatlands Road Between points K1, K2 and K3 Paths between points K1 and K4 and points K5 and K6 and existing footway network
71 Track between Black Path and Lee Brae Between points K10 and K15 No alternative
71 to 73 Track (Black Path) Between points K9, K10, K11, K12 and K14 Track between points K21 and K22 and existing footway network
72 Path between Black Path and A7 road, High Buckholmside Between points K11 and K20 Existing footway network
72 Plumtreehall Brae (DG 84) Between points K16 and K17 Work No. 10A (pedestrians) Existing road network (vehicles)
73 Road (unnamed) between High and Low Buckholmside at Brewerybrig Between points K26 and K27

Path between points K26 and K27 and Work No. 10C (pedestrians)

No alternative (vehicles)

73 Track to Ladhope Vale (A7) Between points K12 and K13 No alternative
73 Footway (Ladhope Vale (A7)) Between points K13 and K14 Existing footway network
73, 74 Currie Road (DG 125/2) Between points K34 and K35 Work No. 10E
74 Station Brae (B6374) Between points K30 and K31 Works Nos. 10D and 10E and existing road network
74 Track (Black Path) Between points K32 and K33 Existing footway network
74 Langhaugh Industrial Estate Road (DG 125/2) Between points K38 and K39 Work No. 10H and existing road network
74 Path between Langhaugh Industrial Estate Road (DG125/2) and Langhaugh Lane Between points K40 and K41 Work No. 10H, path between points K41 and K42 and existing road network
74, 75 Track (Black Path) Between points K46, K47, K48, K49, K50, K51, K52 and K53 Track between points K46, K57, K58 and K53
75 Tracks between Glenfield Road West and Black Path Between points K54 and K48, points K55 and K49, points K50 and K52 and points K56 and K52 Track between points K46, K57, K58 and K53 and points K58 and K56 and existing road network
75 Path at Glenfield Between points K47 and K56 Track between points K46, K57 and K58, and points K56 and K58
75 to 77 Track (Black Path) Between points K51, K63, K73, K75 and K76 Existing footbridge to south of Gala Water then existing footway and footpath network to point K82
76 Middle section of path between Langlee Drive and Dale Street Between points K60, K61, and K62 Work No. 10J
76 Spur path between Black Path and pedestrian footbridge over Gala Water Between points K63 and K64 No alternative
76 Path between playground at Woodstock Avenue and point K71 Between points K67, K68, K69, K70 and K71 No alternative
76 Track between Woodstock Avenue and Black Path Between points K72 and K73 No alternative
76 Track between Winston Place and Black Path Between points K74 and K75 No alternative
77 Track (Southern Upland Way/Black Path) Between points K77, K76, K78, K80, K81 and K83 Path between points K82 and K83
77 Access to Black Path Between points K79 and K80 No alternative
77 Path, Lowood to Tweedbank Between points K84 and K85 No alternative
77, 78 Track (Black Path) Between points K81, K84 and K86 Existing footpath and footway network on south side of railway
78 Path, Well Park to Tweedbank Between points K86 and K87 No alternative
78 Track (Southern Upland Way/Black Path) Between points K86 and K88 Existing footway network on south side of railway

Part 2 SRoads to be temporarily stopped up

Sheet of Parliamentary plans Road to be stopped up Extent of temporary stopping up
(1) (2) (3)
In the local government area of Midlothian—
4 Old Craighall Road, Wester Millerhill Between points A10 and A11
5, 6 The City of Edinburgh Bypass (A720), Sheriffhall Between points A18, A19, A20 and A21
9 Track between Hardengreen House and K&I Coachworks, Hardengreen Between points B18 and B19
11 Roads (A7 and B6392), Hardengreen Junction Between points B21 and B22 and points B23 and B24
16 Povert Road Between points C2a and C2b
17 Road (A7), near Gore Glen Country Park Between points C11 and C12
25 Path between Birky Side and Borthwick Bank Between points D1 and D2
28 Track between B6367 road and Halflaw Kiln Between points D3, D4 and D5
In the local government area of Scottish Borders—
37 Road (C11 Hangingshaw branch) Between points E5 and E6
71 Wheatlands Road (DG108) Between points K7 and K8
72 Plumtreehall Brae (DG84) Between points K18 and K19
72 Track (above Black Path) Between points K24 and K25
72, 73 Low Buckholmside Road (DG68) Between points K22 and K23
73 Ladhope Vale (A7) Between points K28 and K29
74 Road (DG115/2) Between points K36 and K37
74 Glenfield Road West (DG39) Between points K43 and K44
74, 75 Glenfield Road West (DG39) and Glenfield Road East (DG38) Between points K44 and K45
75 Gala Water Footbridge Between points K53 and K59
75 Path (Ovens Underpass off Glenfield Road East (DG38)) Between points K55a and K56
76 Track (above Black Path) Between points K65, K64 and K66
77 Winston Road (DG110) Between points K76 and K77

SCHEDULE 5SSafeguarding works: procedure

(introduced by section 12)

1SSafeguarding works may be carried out—

(a)at any time before or during the construction in the vicinity of the building of any part of the authorised works; or

(b)after the completion of the construction of that part of the authorised works, at any time up to the end of the period of five years beginning with the day on which that part of the authorised works is first opened for use.

2SFor the purpose of determining how the powers of section 12 of this Act are to be exercised, the authorised undertaker may enter and survey any building falling within subsection (1) of that section and any land belonging to it.

3SFor the purpose of carrying out safeguarding works to a building under section 12 of this Act, the authorised undertaker may (subject to paragraphs 4 and 5 below)—

(a)enter the building and any land belonging to it; and

(b)where the works cannot be carried out reasonably conveniently without entering land adjacent to the building, enter the adjacent land (but not any building erected on it).

4SBefore exercising—

(a)a right under section 12 of this Act above to carry out safeguarding works to a building;

(b)a right under paragraph 2 above to enter a building;

(c)a right under paragraph 3(a) above to enter a building or land; or

(d)a right under paragraph 3(b) above to enter land,

the authorised undertaker shall, except in the case of emergency, serve on the owners and occupiers of the building or land not less than 14 days' notice of its intention to exercise that right; and in a case falling within sub-paragraph (a) or (c) above the notice shall also specify the safeguarding works proposed to be carried out.

5SWhere notice is served under paragraph 4(a), (c) or (d) above, the owner or occupier of the building or land concerned may, by serving a counter-notice within the period of 10 days beginning with the day on which the notice was served, require the question whether it is necessary or expedient to carry out the safeguarding works or to enter the building or land to be referred to arbitration under section 34 of this Act.

6SThe authorised undertaker shall compensate the owners and occupiers of any building or land in relation to which the powers of this schedule have been exercised for any loss or damage arising to them by reason of the exercise of those powers.

7SWhere—

(a)safeguarding works to a building are carried out under section 12 of this Act; and

(b)within the period of five years beginning with the day on which the part of the authorised works constructed in the vicinity of the building is first opened for use, it appears that the safeguarding works are inadequate to protect the building against damage caused by the construction or operation of that part of the authorised works,

the authorised undertaker shall compensate the owners and occupiers of the building for any damage sustained by them.

8SNothing in this schedule shall relieve the authorised undertaker from any liability to pay compensation under the Land Clauses Acts.

9SAny compensation payable under paragraph 7 above or under the Lands Clauses Acts shall be determined, in case of dispute, under the 1963 Act.

SCHEDULE 6SAcquisition of land, etc. outside limits of deviation

(introduced by sections 13 and 15)

Part 1 SAcquisition of land

Location Sheet of Parliamentary plans Number of land shown on plans Purposes for which land to be acquired
(1) (2) (3) (4)
In the local government area of Midlothian—
Harelaw Farm 3 41a, 41b, 41d, 41e Station car park and access.
Harelaw 3 54, 54a, 59, 60 Relocation of apparatus (subsoil only).
Harelaw 3 63, 69 Installation of equipment and compound.
Sheriffhall 6 158 Provision of track.
Glenesk 6, 7 159 Provision of track.
Glenesk 7 162 Provision of track.
Hardengreen Lane 9 194, 196 Station access.
Hardengreen 9 202a, 203, 203a Relocation of apparatus.
Hardengreen 9, 10 191 Station access.
Hardengreen 10 192, 193 Station access.
Lothian Cottage 12 255, 257 Relocation of apparatus (subsoil only).
Redwood Walk 12 261, 261a Provision of track.
New Star Bank 13 266 Provision of track.
Murderdean Road 13 281, 282, 282a, 283, 284, 285, 286a Station car park and access.
Jenks Loan 13 287 Installation of equipment and compound.
Brewer's Bush Bridge 14 300, 302, 302a Access for construction and thereafter for maintenance.
Redheugh 16 325 Access for construction and thereafter for maintenance.
Shank Bridge 17, 19 346 Access for construction and thereafter for maintenance. Provision of track.
Gorebridge 19 355, 356, 357 Access for construction and thereafter for provision of track.
Gorebridge 19 359 Access for construction and thereafter for maintenance. Relocation of apparatus (subsoil only).
Station Road 19 389 Station car park and access.
Station Road 19 387, 392, 393 Road improvements and landscaping.
Robertson's Bank 20 401, 402 Installation of equipment and compound.
Catcune 22 431 Installation of apparatus (subsoil only).
Borthwick Mains 23 430a, 432, 432a Installation of apparatus (subsoil only).
Borthwick Mains 24 435 Installation of equipment and compound.
Maggie Bowies Glen 27 467, 468 Installation of apparatus (subsoil only).
Tynehead 28 477, 479 Access for construction and thereafter for provision of track.
Tynehead 31 497 Access for construction and thereafter for maintenance.
In the local government area of Scottish Borders—
Tynehead 31 13 Installation of apparatus (subsoil only).
Tynehead and Cowbraehill 31, 32 13b Installation of apparatus (subsoil only).
Falahill 33 43 Access for construction and thereafter for provision of track.
Falahill 33, 34 44, 44b Access for construction and thereafter for provision of car park and access.
Falahill 34, 35 53, 54

Access for construction and thereafter for maintenance.

Road improvements and landscaping.

Heriot 36 75, 77, 80, 120, 120a, 120b, 120c, 123a Road improvements and landscaping.
Heriot 36, 37 107 Road improvements and landscaping.
Heriot 37 100, 101, 116 Road improvements and landscaping.
Hangingshaw 37 124

Access for construction.

Riverbank protection.

Hangingshaw 37 121, 141, 142, 143 Road improvements and landscaping.
Stagebank 38 150 Access for construction and thereafter for maintenance.
Stagebank 38 156

Access for construction.

Riverbank protection.

Haltree 40 171

Access for construction.

Riverbank protection.

Crookston 42 180 Access for construction and thereafter for maintenance.
Fountainhall 44 212 Construction and maintenance compound and access for construction and thereafter for maintenance.
Fountainhall 45 239, 240, 241

Access for construction.

Riverbank protection.

Pirn House 48 273, 274

Access for construction.

Riverbank protection.

Pirn House 50 276

Access for construction.

Riverbank protection.

Watherston 51 290, 291

Access for construction.

Riverbank protection.

Galabank 52 309 Access for construction and thereafter for maintenance.
Galabank 53 324, 325, 326

Access for construction.

Riverbank protection.

Galabank 53 328 Access for construction and thereafter for maintenance.
Stow 53, 54 329, 330, 331

Access for construction.

Riverbank protection.

Stow 54 332

Access for construction.

Riverbank protection.

Stow 54 339 Access for construction and thereafter for provision of track.
Stow Stow plan 336a, 337b, 337c, 340a, 340b, 341, 341a, s8, s9, s10 Station car park and access.
Stow 56 351, 352

Access for construction.

Riverbank protection.

Stow 57 367 Installation of apparatus (subsoil only).
Stow 57, 58 368 Installation of apparatus (subsoil only).
Stow 58 370, 371 Installation of apparatus (subsoil only).
Bowshank 61 525, 526

Access for construction.

Riverbank protection.

Bowshank 62 534 Access for construction and thereafter for maintenance.
Bowland Bridge 62, 63 547

Access for construction.

Riverbank protection.

Bowland Wood 63 554 Access for construction and thereafter for maintenance.
Whitelee House 64 556, 557, 558, 559

Access for construction.

Riverbank protection.

Robin's Knowe 65 583, 584

Access for construction.

Riverbank protection.

Torwoodlee 65, 66 585

Access for construction.

Riverbank protection.

Torwoodlee 65, 66 586 Access for construction and thereafter for maintenance.
Torwoodlee Tunnel 70 611 Access for construction and thereafter for maintenance.
Mill Park 70 629 Access for construction and thereafter for provision of track.
Mill Park 70, 71 628, 630 Access for construction and thereafter for provision of track.
Wheatlands Road 71 645, 646, 648 Access for construction and thereafter for maintenance.
Plumtreehall Brae 72 665, 670, 671 Road improvements and landscaping.
Plumtreehall Brae 72 686 Access for construction and thereafter for provision of track.
Plumtreehall Brae 72 689

Access for construction.

Riverbank protection.

Low Buckholmside 72 698 Access for construction and thereafter for accommodation access.
Low Buckholmside 72, 73 703

Access for construction.

Riverbank protection.

Low Buckholmside 73 705 Provision of turning head for vehicles.
Currie Road 74 739, 739a, 741, 745, 746, 749, 751, 756 Access for construction and thereafter for maintenance.
Glenfield Road 74 760a Relocation of apparatus (subsoil only).
Glenfield Road 74, 75 763 Relocation of apparatus (subsoil only).
Galafoot 77 800, 806, 808 Installation of apparatus (subsoil only).
Tweedbank 78 814 Access for construction and thereafter for maintenance.
Tweedbank 78 817 Station car park and access.

Part 2 SAcquisition of rights only

Location Sheet of Parliamentary plans Number of land shown on plans Purposes for which rights may be acquired
(1) (2) (3) (4)
In the local government area of Midlothian—
Whitehill Mains 1, 1A 8 Access for construction and thereafter for maintenance.
Shawfair 1 9 Access for construction and thereafter for maintenance.
Millerhill Marshalling Yard 1 10 Access for construction and thereafter for maintenance.
Shawfair 2 5a, 12, 12a, 12c, 13, 15, 17, 18, 19, 21, 23 Ground stabilisation.
Shawfair 2, 3 29, 31 Ground stabilisation.
Newton Church Road 3 32, 34 Ground stabilisation.
Harelaw Farm 3 48, 50 Ground stabilisation.
Harelaw 3 51, 53, 55, 57, 58, 60, 70, 72 Ground stabilisation.
Harelaw 3 61 Access for construction and thereafter for maintenance.
Longthorn 3 75 Ground stabilisation.
Longthorn 3, 4 78 Ground stabilisation.
Longthorn 4 79, 80, 83 Ground stabilisation.
Millerhill Road 4 94, 98, 98a, 98b, 99, 102, 126a Ground stabilisation.
The Cockatoo public house 4 118 Access for construction and thereafter for maintenance.
Wester Millerhill 4 119, 122 Ground stabilisation.
Millerhill Road 4, 5 126, 127 Ground stabilisation.
Sheriffhall 5 140 Access for construction and thereafter for maintenance. Ground stabilisation.
Sheriffhall 5, 6 139, 144 Access for construction and thereafter for maintenance. Ground stabilisation.
Sheriffhall 6 145, 147 Ground stabilisation.
Sheriffhall 6 149, 150a Access for construction and thereafter for maintenance. Ground stabilisation.
Glenesk 7 163, 165, 166, 167, 168, 169, 170, 175 Access for construction and thereafter for maintenance.
Station Road, Eskbank 8 186 Access for construction and thereafter for maintenance.
Hardengreen 9 210 Access for construction and thereafter for maintenance.
Hardengreen 9, 10 213 Access for construction and thereafter for maintenance.
Dalhousie Mains 11 231, 233 Access for construction and thereafter for maintenance.
Newbattle Viaduct 11 243 Access for construction and thereafter for maintenance.
Newbattle Viaduct 11, 12 244 Access for construction and thereafter for maintenance.
Newbattle Viaduct 12 247, 249 Access for construction and thereafter for maintenance.
Dalhousie Road 12 258 Access for construction and thereafter for maintenance.
Newtongrange 13 275, 275a Access for construction and thereafter for maintenance.
Redheugh 15 309 Access for construction and thereafter for maintenance.
Gore Glen Country Park 16, 17 336 Access for construction and thereafter for maintenance.
Shank Bridge 17 338a Access for construction and thereafter for maintenance.
Millbank House 17, 18 344 Access for construction and thereafter for maintenance.
Arniston Engine 18 343 Access for construction and thereafter for maintenance.
Gorebridge 19 358 Access for construction and thereafter for maintenance.
Robertson's Bank 20 403 Access for construction and thereafter for maintenance.
Catcune 21 423 Access for construction and thereafter for maintenance.
Tynehead 28 471, 472 Access for construction and thereafter for maintenance.
Tynehead 29, 30 488, 490 Ground stabilisation.
Tynehead 31 496 Access for construction and thereafter for maintenance.
In the local government area of Scottish Borders—
Tynehead 31 13 Access for construction and thereafter for maintenance.
Tynehead and Cowbraehill 31, 32 13b Access for construction and thereafter for maintenance.
Falahill 34 45 Access for construction and thereafter for maintenance.
Falahill 35 59, 60 Access for construction and thereafter for maintenance.
Heriot 36 74 Access for construction and thereafter for maintenance.
Hangingshaw 37 126 Access for construction and thereafter for maintenance.
Stagebank 38 146, 153 Access for construction and thereafter for maintenance.
Haltree 40 169 Access for construction and thereafter for maintenance.
Crookston 41 174 Access for construction and thereafter for maintenance.
Crookston Cottage 42 177 Access for construction and thereafter for maintenance.
Fountainhall 45 229 Access for construction and thereafter for maintenance.
Plenploth 46 246, 248 Access for construction and thereafter for maintenance.
Torquhan 48, 49 266 Access for construction and thereafter for maintenance.
Torquhan 49 267, 268 Access for construction and thereafter for maintenance.
Watherston 50 280, 286, 287, 288 Access for construction and thereafter for maintenance.
Galabank 52 308, 315, 316, 318a, 323 Access for construction and thereafter for maintenance.
Stow 55 348 Access for construction and thereafter for maintenance.
Stow 57 355 Access for construction and thereafter for maintenance.
Bowshank 60 409, 500, 502, 503, 504, 506 Ground stabilisation.
Bowland Wood 63 551 Access for construction and thereafter for maintenance.
Whitelee House 64 565 Access for construction and thereafter for maintenance.
Torwoodlee Golf Course 66, 69 588 Access for construction and thereafter for maintenance.
Torwoodlee 69 590, 591 Access for construction and thereafter for maintenance.
Kilnknowe Place 71 647 Access for construction and thereafter for maintenance.
Ladhope Vale 73 709, 710 Ground stabilisation.
Woodstock Avenue 76 784, 784a, 785 Ground stabilisation.
Winston Place 76, 77 786, 786a, 786b Ground stabilisation.
Winston Place 77 787 Ground stabilisation.

SCHEDULE 7SLand of which temporary possession may be taken

(introduced by section 17)

Location Sheet of Parliamentary plans Number of land shown on plans Purposes for which temporary possession may be taken Authorised work
(1) (2) (3) (4) (5)
In the local government area of Midlothian—
Whitehill Mains 1 1 Construction compound, working space and access for construction. Work No. 1
Whitehill Road 1 2, 4 Construction compound, working space and access for construction. Work No. 1
Millerhill Marshalling Yard 1 7, 10 Construction compound, working space and access for construction. Work No. 1
Shawfair 1 9 Construction compound, working space and access for construction. Work No. 1
Millerhill 1, 2 5 Working space. Work No. 1
Millerhill Marshalling Yard 1, 2 11 Construction compound, working space and access for construction. Work No. 1
Shawfair 2 12, 12a, 12c, 13, 15, 17, 18, 19, 21, 23, 29a Working space. Works Nos. 1, 1A
Shawfair 2 27 Construction compound, working space and access for construction. Work No. 1
Shawfair 2, 3 29, 31 Working space. Work No. 1
Longthorne 3 32, 34, 40b Construction compound, working space and access for construction. Works Nos. 1, 1B, 1C
Newton Church Road 3 35, 35a, 36 Working space. Work No. 1C
Harelaw Farm 3 38a, 38b, 41, 41c Construction compound, working space and access for construction. Works Nos. 1, 1C, 1D
Harelaw Farm 3 38g, 38j, 38k, 39a, 39b, 39c, 43, 43a, 48, 50 Working space. Works Nos. 1, 1C, 1D, 1E
Harelaw 3 51, 53, 55, 57, 58, 70, 72 Working space. Works Nos. 1, 1F
Harelaw 3 54, 59, 60 Construction compound, working space and access for construction. Works Nos. 1, 1F
Longthorn 3 75 Construction compound, working space and access for construction. Work No. 1
Longthorn 3, 4 78 Construction compound, working space and access for construction. Work No. 1
Longthorn 4 79, 80, 83, 114 Construction compound, working space and access for construction. Works Nos. 1, 1G, 1H
Millerhill Road 4 91a, 94, 95b, 98, 98a, 98b, 99, 102, 126a Construction compound, working space and access for construction. Works Nos. 1, 1G, 1J
The Cockatoo public house 4 117, 118 Construction compound, working space and access for construction. Works Nos. 1, 1G, 1J
Wester Millerhill 4 119, 122 Construction compound, working space and access for construction. Works Nos. 1, 1J
Millerhill Road 4, 5 126, 127 Construction compound, working space and access for construction. Works Nos. 1, 1J, 1K
Sheriffhall 5 140 Construction compound, working space and access for construction. Works Nos. 1, 1J
Sheriffhall 5, 6 139, 144 Construction compound, working space and access for construction. Works Nos. 1, 1J
Sheriffhall 5, 6 141, 143 Construction of bridge under the City of Edinburgh Bypass. Work No. 1
Sheriffhall 6 145, 147, 148, 149, 154, 155, 158 Construction compound, working space and access for construction. Works Nos. 1, 2
Glenesk 6, 7 159 Construction compound, working space and access for construction. Works Nos. 1, 2
Gilmerton Road 7 178 Construction compound, working space and access for construction. Work No. 2
Glenesk 7 162, 163, 165, 166, 167, 168, 169, 170, 174, 175 Construction compound, working space and access for construction. Work No. 2
Eskbank 7, 8 177 Construction compound, working space and access for construction. Work No. 2
Eskbank 8 179a, 180 Construction compound, working space and access for construction. Work No. 2
Station Road, Eskbank 8 186, 186a, 186c Construction compound, working space and access for construction. Work No. 2
Hardengreen 9 191a, 195, 197c, 200a, 200b, 209, 210, 211, 212 Construction compound, working space and access for construction. Works Nos. 2, 2A, 2B, 2C, 2D
Hardengreen 9, 10 213 Construction compound, working space and access for construction. Work No. 2
Hardengreen 9, 11 215, 216, 217 Construction compound, working space and access for construction. Work No. 2
Hardengreen 10 214 Construction compound, working space and access for construction. Work No. 2
Hardengreen Junction 11 218, 218a, 218b, 220, 221, 223, 225, 226, 229 Construction compound, working space and access for construction. Work No. 2
Dalhousie Mains 11 230, 231, 233 Construction compound, working space and access for construction. Work No. 2
Newbattle Viaduct 11 236, 238, 239, 241, 243 Construction compound, working space and access for construction. Work No. 2
Newbattle Viaduct 11, 12 244, 245 Construction compound, working space and access for construction. Work No. 2
Newbattle Viaduct 12 247, 249, 249a, 250, 251, 254 Construction compound, working space and access for construction. Work No. 2
Dalhousie Road 12 258 Construction compound, working space and access for construction. Work No. 2
Butlerfield Industrial Estate 13 288, 289 Construction compound, working space and access for construction. Work No. 2
Newtongrange 13 275, 275a, 276, 277 Construction compound, working space and access for construction. Works Nos. 2, 2F
Victoria Road 13 286, 286b Construction compound, working space and access for construction. Work No. 2
Lady Victoria Colliery 13 291a Construction compound, working space and access for construction. Work No. 2
Butlerfield Industrial Estate 13, 14 290 Construction compound, working space and access for construction. Work No. 2
Lady Victoria Colliery 13, 14 291 Construction compound, working space and access for construction. Work No. 2
Butlerfield Industrial Estate 14 290a, 290b, 299 Construction compound, working space and access for construction. Works Nos. 2, 3
Lady Victoria Colliery 14 293, 293a, 294, 296, 298 Construction compound, working space and access for construction. Works Nos. 2, 3
Brewer's Bush Bridge 14 301, 303, 307 Construction compound, working space and access for construction. Works Nos. 2, 3
Brewer's Bush Bridge 14, 15, 16 304 Construction compound, working space and access for construction. Works Nos. 2, 3
Redheugh 15 308, 309, 310, 311, 312, 313 Construction compound, working space and access for construction. Work No. 3
Redheugh 15, 16 316 Construction compound, working space and access for construction. Work No. 3
Povert Road 16 317, 318, 319, 320, 321, 323, 326, 327, 328, 330, 331, 332, 333, 334 Construction compound, working space and access for construction. Work No. 3
Gore Glen Country Park 16, 17 336, 337 Construction compound, working space and access for construction. Works Nos. 3, 3A
Shank Bridge 16, 17 338 Construction compound, working space and access for construction. Work No. 3
Shank Bridge 17 338a, 342, 345, 348 Construction compound, working space and access for construction. Works Nos. 3, 3B, 3C
Millbank House 17, 18 344 Construction compound, working space and access for construction. Work No. 3C
Shank Bridge 17, 19 348a Construction compound, working space and access for construction. Works Nos. 3, 3B, 3C
Arniston Engine 18 343 Construction compound, working space and access for construction. Work No. 3
Stobs Mills House 19 360, 360a, 361, 362, 366 Construction compound, working space and access for construction. Works Nos. 3, 3C
Stobs Mills House 19 363, 364, 365 Construction compound, working space, access and relocation of apparatus. Works Nos. 3, 3C
Station Road 19 387 Construction compound, working space and access for construction. Work No. 3
St Margaret's Church 19 391 Construction compound, working space and access for construction. Work No. 3
Robertson's Bank 20 400, 401, 402, 413 Construction compound, working space and access for construction. Works Nos. 3, 3D
Robertson's Bank 20, 21 404 Construction compound, working space and access for construction. Works Nos. 3, 3D
Fushiebridge 21 414, 415, 416, 420, 421, 421a Construction compound, working space and access for construction. Work No. 3
Catcune 21 423, 424, 425, 426 Construction compound, working space and access for construction. Work No. 3
Catcune 21, 22 427 Construction compound, working space and access for construction. Work No. 3
Catcune 22 428, 431 Construction compound, working space and access for construction. Work No. 3
Catcune 22, 23 429 Construction compound, working space and access for construction. Work No. 3
Borthwick Mains 24 434, 436, 437, 439, 440, 445, 446 Construction compound, working space and access for construction. Works Nos. 3, 4
Borthwick Mains 24, 25 444 Construction compound, working space and access for construction. Works Nos. 3, 4
Birky Side 24, 25 450 Construction compound, working space and access for construction. Work No. 4
Birky Side 25 451, 452 Construction compound, working space and access for construction. Work No. 4
Birky Side 25, 26 454, 456 Construction compound, working space and access for construction. Work No. 4
Maggie Bowies Glen 26 457, 458 Construction compound, working space and access for construction. Work No. 4
Maggie Bowies Glen 26, 27 459, 460 Construction compound, working space and access for construction. Work No. 4
Maggie Bowies Glen 27 461, 462, 463, 464, 465, 467, 468 Construction compound, working space and access for construction. Work No. 4
Maggie Bowies Glen 27, 28 466, 469, 470 Construction compound, working space and access for construction. Work No. 4
Tynehead 28 475, 478, 480 Construction compound, working space and access for construction. Work No. 4
Tynehead 28, 29 482 Construction compound, working space and access for construction. Work No. 4
Tynehead 29 484, 485, 486, 487 Construction compound, working space and access for construction. Work No. 4
Tynehead 29, 30 488, 490 Construction compound, working space and access for construction. Work No. 4
Tynehead 30 491 Construction compound, working space and access for construction. Work No. 4
Tynehead 30, 31 495 Construction compound, working space and access for construction. Work No. 4
Tynehead 31 499, 502 Construction compound, working space and access for construction. Works Nos. 4, 5
In the local government area of Scottish Borders—
Tynehead 30 1, 5, 6 Construction compound, working space and access for construction. Work No. 4
Tynehead 30, 31 9 Construction compound, working space and access for construction. Work No. 4
Tynehead 31 10, 11, 12a, 12b, 15 Construction compound, working space and access for construction. Work No. 5
Tynehead and Cowbraehill 31, 32 12 Construction compound, working space and access for construction. Work No. 5
Cowbraehill 32 17, 18, 19, 21 Construction compound, working space and access for construction. Work No. 5
Cowbraehill and Falahill 32, 33 22 Construction compound, working space and access for construction. Works Nos. 5, 5A, 5B
Falahill 33 24, 28, 30, 30a, 31, 32, 40, 41 Construction compound, working space and access for construction. Works Nos. 5, 5A, 5B
Falahill 33, 34 33 Construction compound, working space and access for construction. Works Nos. 5, 5A, 5B
Falahill 34 46, 47 Construction compound, working space and access for construction. Works Nos. 5, 5A
Falahill 34, 35 52 Construction compound, working space and access for construction. Work No. 5
Falahill 35 55, 56, 57, 59, 60, 61 Construction compound, working space and access for construction. Work No. 5
Heriot 35, 36 64, 65 Construction compound, working space and access for construction. Works Nos. 5, 5C
Heriot 36 67, 74, 76, 77, 79, 88 Construction compound, working space and access for construction. Works Nos. 5, 5C, 5D
Heriot 36, 37 85a, 91, 123 Construction compound, working space and access for construction. Works Nos. 5, 5D, 5E
Heriot 37 101, 102, 113, 114, 115 Construction compound, working space and access for construction. Works Nos. 5D, 5F
Hangingshaw 37 121a, 125, 126, 128, 132, 140, 144 Construction compound, working space and access for construction. Works Nos. 5, 5D, 5G
Stagebank 38 146, 147, 153, 154, 155 Construction compound, working space and access for construction. Works Nos. 5, 6
Stagebank 38, 39 158, 159 Construction compound, working space and access for construction. Works Nos. 5, 6
Stagebank 39, 40 159a, 161 Construction compound, working space and access for construction. Work No. 6
Haltree 40 167, 168, 169, 170 Construction compound, working space and access for construction. Work No. 6
Crookston 41 173, 174 Construction compound, working space and access for construction. Work No. 6
Crookston 41, 42 175 Construction compound, working space and access for construction. Work No. 6
Crookston 42 176 Construction compound, working space and access for construction. Work No. 6
Crookston Cottage 42 177 Construction compound, working space and access for construction. Work No. 6
Crookston 42, 43 179, 181 Construction compound, working space and access for construction. Works Nos. 6, 7
Hazelbank 43 182, 184, 185, 187, 189 Construction compound, working space and access for construction. Works Nos. 6, 7
Hazelbank 43, 44 191 Construction compound, working space and access for construction. Works Nos. 6, 7, 7A
Fountainhall 43, 44 193 Construction compound, working space and access for construction. Works Nos. 7, 7A
Fountainhall 44 191a, 192, 200, 209, 217, 218, 218a, 220, 221, 222, 222a, 222b, 222c, 224 Construction compound, working space and access for construction. Works Nos. 7, 7A, 7B
Fountainhall 44, 45 223 Construction compound, working space and access for construction. Works Nos. 7, 7B
Fountainhall 45 224a, 225a, 233, 236, 237, 238, 242 Construction compound, working space and access for construction. Works Nos. 7, 7B
Fountainhall 45 235 Access for construction of fence. Works Nos.7, 7B
Fountainhall 45, 46 243 Construction compound, working space and access for construction. Work No. 7
Plenploth 46 245, 246, 248 Construction compound, working space and access for construction. Work No. 7
Plenploth 46, 47 250 Construction compound, working space and access for construction. Work No. 7
Plenploth 47 251, 252, 253, 255, 255a, 257 Construction compound, working space and access for construction. Work No. 7
Torquhan 47, 48 262, 264, 265 Construction compound, working space and access for construction. Work No. 7
Torquhan 48 263 Construction compound, working space and access for construction. Work No. 7
Torquhan 48, 49 266 Construction compound, working space and access for construction. Work No. 7
Pirn House 48 270, 272 Construction compound, working space and access for construction. Work No. 7
Pirn House 48, 50 275 Construction compound, working space and access for construction. Work No. 7
Torquhan 49 267, 268 Construction compound, working space and access for construction. Work No. 7
Torquhan 50 271a Construction compound, working space and access for construction. Work No. 7
Pirn House 50 277 Construction compound, working space and access for construction. Work No. 7
Watherston 50 280, 281, 282, 283, 284, 285, 286, 287, 288, 289 Construction compound, working space and access for construction. Work No. 7
Watherston 51 293, 294, 295, 295a, 297, 298, 299, 300, 301, 303 Construction compound, working space and access for construction. Work No. 7
Watherston 51, 52 305, 306 Construction compound, working space and access for construction. Work No. 7
Watherston 52 306a Construction compound, working space and access for construction. Work No. 7
Galabank 52 308, 311, 312, 313, 314, 315, 316, 318a, 320, 323 Construction compound, working space and access for construction. Work No. 7
Stow 54 338 Construction compound, working space and access for construction. Works Nos. 7, 8
Stow Stow plan 344, s3 Construction compound, working space and access for construction. Work No. 8
Stow 55 347, 348 Construction compound, working space and access for construction. Work No. 8
Stow 55, 56 349, 350 Construction compound, working space and access for construction. Work No. 8
Stow 56, 57 353 Construction compound, working space and access for construction. Work No. 8
Stow 57 354, 355, 356, 360, 362, 363, 365 Construction compound, working space and access for construction. Work No. 8
Stow 57, 58 366 Construction compound, working space and access for construction. Work No. 8
Stow 57, 58, 59 369 Construction compound, working space and access for construction. Work No. 8
Stow 58 366a Construction compound, working space and access for construction. Work No. 8
Ferniehirst 58, 59 372 Construction compound, working space and access for construction. Work No. 8
Bow 59 394, 395, 396, 397 Construction compound, working space and access for construction. Works Nos. 8, 8A
Ferniehirst 59 374, 376, 378, 378a, 379 Construction compound, working space and access for construction. Works Nos. 8, 8A
Bow 59, 60 398, 402 Construction compound, working space and access for construction. Works Nos. 8, 8A
Bow 60 403, 404, 405, 406a Construction compound, working space and access for construction. Work No. 8
Bowshank 60 407, 409, 500, 502, 503, 504, 506, 507, 508, 513, 514, 515, 515a, 520, 522 Construction compound, working space and access for construction. Work No. 8
Bowshank 60, 61 515b, 523 Construction compound, working space and access for construction. Work No. 8
Bowshank 61 515c, 527, 530, 531 Construction compound, working space and access for construction. Work No. 8
Bowshank 62 533, 535, 536 Construction compound, working space and access for construction. Works Nos. 8, 9
Bowland Bridge 62 537, 538, 543, 545, 546 Construction compound, working space and access for construction. Works Nos. 8, 9
Bowland Wood 63 549, 550, 551, 552 Construction compound, working space and access for construction. Work No. 9
Whitelee House 64 560, 561, 562, 563, 564, 565, 566, 568 Construction compound, working space and access for construction. Work No. 9
Whitelee House 64, 65 566a Construction compound, working space and access for construction. Work No. 9
Whitelee House 65 566b Construction compound, working space and access for construction. Work No. 9
Robin's Knowe 65 570, 571, 572, 574, 575, 576, 577, 577a, 577b, 581 Construction compound, working space and access for construction. Work No. 9
Robin's Knowe 65, 66 582 Construction compound, working space and access for construction. Work No. 9
Torwoodlee 66 582a, 587, 589 Construction compound, working space and access for construction. Work No. 9
Torwoodlee Golf Course 66, 69 588 Construction compound, working space and access for construction. Work No. 9
Torwoodlee 66, 70 602, 604 Construction compound, working space and access for construction. Work No. 9
Torwoodlee 66, 67, 68 603 Construction compound, working space and access for construction. Work No. 9
Torwoodlee 69 588a, 590, 591, 591a, 592, 593, 594, 595, 596, 597, 598 Construction compound, working space and access for construction. Work No. 9
Torwoodlee Tunnel 70 606, 607, 608, 609, 610, 614, 616, 617 Construction compound, working space and access for construction. Works Nos. 9, 10
Wood Street 70 619, 619a, 620, 620a, 621, 623, 623a Construction compound, working space and access for construction. Works Nos. 9, 10
Mill Park 70 624a Construction compound, working space and access for construction. Works Nos. 9, 10
Mill Park 70, 71 624, 625 Construction compound, working space and access for construction. Works Nos. 9, 10
Kilnknowe Place 71 632, 633, 635, 636, 637, 639, 640, 641, 644, 647, 654, 655 Construction compound, working space and access for construction. Work No. 10
Kilnknowe Place 71, 72 656 Construction compound, working space and access for construction. Work No. 10
Plumtreehall Brae 71, 72 658, 659, 660, 661, 662 Construction compound, working space and access for construction. Works Nos. 10, 10A, 10B
High Buckholmside 72 691, 692 Construction compound, working space and access for construction. Work No. 10
Low Buckholmside 72 693, 694, 695a, 696, 696a Construction compound, working space and access for construction. Work No. 10
Plumtreehall Brae 72 663, 666, 667, 668, 669, 672, 673, 676, 684, 687, 687a, 688, 690 Construction compound, working space and access for construction. Works Nos. 10, 10A, 10B
Low Buckholmside 72, 73 695, 697, 699 Construction compound, working space and access for construction. Works Nos. 10, 10C
Low Buckholmside 73 697a, 704, 708 Construction compound, working space and access for construction. Works Nos. 10, 10C
Ladhope Vale 73 709, 710, 712 Construction compound, working space and access for construction. Works Nos. 10, 10E
Currie Road 74 726, 728, 731, 731a, 732, 732a, 734, 736, 743, 743a, 748b, 750, 758, 762 Construction compound, working space and access for construction. Works Nos. 10, 10D, 10E, 10F, 10G, 10H
Glenfield Road 75 763a, 765, 766, 770, 771 Construction compound, working space and access for construction. Works Nos. 10, 10J
Glenfield Road 75, 76, 77 772 Construction compound, working space and access for construction. Work No. 10
Glenfield Road 76 775, 776, 778 Construction compound, working space and access for construction. Works Nos. 10, 10J
Woodstock Avenue 76 780, 781, 781a, 782, 784a, 785 Construction compound, working space and access for construction. Work No. 10
Winston Place 76, 77 786a, 786b Construction compound, working space and access for construction. Work No. 10
Winston Place 77 787 Construction compound, working space and access for construction. Work No. 10
Winston Road 77 788, 790, 791, 792, 794, 795 Construction compound, working space and access for construction. Work No. 10
Galafoot 77 797, 797a, 798, 798a, 799, 802, 803, 804, 805, 807, 809, 810, 811 Construction compound, working space and access for construction. Work No. 10
Tweedbank 77,78 812, 813 Construction compound, working space and access for construction. Work No. 10
Tweedbank 78 815, 816, 822, 823, 823b, 824 Construction compound, working space and access for construction. Works Nos. 10, 10K, 10L

SCHEDULE 8SStatutory undertakers, etc.

(introduced by section 33)

1SSubject to the provisions of this schedule, sections 224 to 227 of the 1997 Act (power to extinguish rights of statutory undertakers, etc. and power of statutory undertakers, etc. to remove or re-site apparatus) shall apply in relation to any land which has been acquired under this Act, or which is held by the authorised undertaker and is appropriated or used (or about to be used) by it for the purposes of this Act or for purposes connected with this Act.

2SAll such other provisions of the 1997 Act as apply for the purposes of the provisions applied by paragraph 1 above (including sections 228 to 231, which contain provisions consequential on the extinguishment of any rights under sections 224 and 225, and sections 232(2) to (4), 233 and 235, which provide for the payment of compensation) shall have effect accordingly.

3SIn the provisions of the 1997 Act, as applied by paragraphs 1 and 2 above—

(a)references to the purpose of carrying out any development with a view to which land was acquired or appropriated are references to the purpose of carrying out the authorised works; and

(b)references to land acquired or appropriated as mentioned in section 224(1) of the 1997 Act are references to land acquired, appropriated or used as mentioned in paragraph 1 above.

4SWhere any apparatus of a utility undertaker or of a public telecommunications operator is removed in pursuance of a notice or order given or made under section 224, 225 or 226 of the 1997 Act, as applied by paragraph 1 above, any person who is the owner or occupier of premises to which a supply was given from that apparatus shall be entitled to recover from the authorised undertaker compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of effecting a connection between the premises and any other apparatus from which a supply is given.

5SParagraph 4 above shall not apply in the case of the removal of a public sewer, but where such a sewer is removed in pursuance of such a notice or order as is mentioned in that paragraph, any person who is—

(a)the owner or occupier of premises the drains of which communicated with that sewer; or

(b)the owner of a private sewer which communicated with that sewer,

shall be entitled to recover from the authorised undertaker compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of making the person's drain or sewer communicate with any other public sewer or with a private sewage disposal plant.

6SThe provisions of the 1997 Act mentioned in paragraphs 1 and 2 above, as applied by those paragraphs, shall not have effect in relation to apparatus as respects which Part IV of the 1991 Act applies.

7SIn this schedule—

  • gas transporter” has the meaning given by section 7(1) of the Gas Act 1986 (c. 44);

  • public telecommunications operator” means—

    (a)

    a person authorised, by a licence to which section 9 of the Telecommunications Act 1984 (c. 12) applies, to run a public telecommunications system; or

    (b)

    a person to whom the telecommunications code has been applied pursuant to section 10 of that Act; and

  • utility undertaker” means a person who is—

    (a)

    authorised by any enactment to carry on an undertaking for the supply of water;

    (b)

    a gas transporter; or

    (c)

    the holder of a licence under section 6 of the Electricity Act 1989 (c. 29),

    and who is, or is deemed to be, a statutory undertaker within the meaning of section 214 of the 1997 Act.

SCHEDULE 9SListed buildings and conservation areas

(introduced by section 36)

1(1)Subject to sub-paragraph (2) below, if a listed building was such a building immediately before 21 March 2003 and is specified in columns (1), (2) and (3) of the following table—S

(a)section 6 of the Listed Buildings Act (restriction on works affecting listed buildings) shall not apply to works carried out in relation to the building in exercise of the powers conferred by Part 1 of this Act;

(b)to the extent that a notice issued in relation to the building under section 34(1) of that Act (enforcement) requires the taking of steps which would be rendered ineffective, or substantially ineffective, by works proposed to be carried out in exercise of the powers conferred by Part 1 of this Act, it shall not have effect or, as the case may be, shall cease to have effect;

(c)no steps may be taken in relation to the building under section 38(1) of that Act (execution of works specified in notice under section 34(1)) which would be rendered ineffective, or substantially ineffective, by such works as are mentioned in paragraph (b) above; and

(d)no works may be executed for the preservation of the building under section 49 of that Act (urgent works to preserve unoccupied listed buildings) which would be rendered ineffective, or substantially ineffective, by such works as are mentioned in paragraph (b) above.

(2)In the case of any building specified in columns (1), (2) and (3) of the following table in relation to which any description of works is specified in column (4) of that table, sub-paragraph (1) above shall have effect as if the references to works carried out in exercise of the powers conferred by Part 1 of this Act were, so far as concerns works of demolition or alteration (as opposed to extension), to works so carried out which are of a description specified in relation to it in that column.

(3)Paragraphs (a) to (d) of sub-paragraph (1) above shall also apply in relation to a listed building which was not such a building immediately before 21 March 2003.

(4)If a building included in a conservation area and not a listed building—

(a)was not included in a conservation area immediately before 21 March 2003; or

(b)was included in such an area immediately before that date and is specified in columns (1), (2) and (3) of the following table,

section 66 of the Listed Buildings Act (control of demolition in conservation areas) shall not apply to the demolition of the building in exercise of the powers conferred by Part 1 of this Act.

(5)Anything which, by virtue of section 1(4) of the Listed Buildings Act (objects or structures fixed to, or within the curtilage of, a building), is treated as part of a building for the purposes of that Act shall be treated as part of the building for the purposes of this paragraph.

Table

Buildings authorised to be demolished or altered

Local government area Sheet of Parliamentary plans Buildings authorised to be demolished or altered Limit of authorised demolition or alteration
(1) (2) (3) (4)
Midlothian 7 Glenesk Viaduct, Dalkeith

Structural repairs to the spandrels and wingwalls.

Provision of cantilevered walkway.

Midlothian 8 Former Eskbank and Dalkeith Station platforms Re-pointing and masonry repairs.
Midlothian 8 Melville Road Bridge, Eskbank (Overbridge 13)

Repairs and re-pointing to masonry and brickwork.

Waterproofing works to bridge arch.

Midlothian 8 Lasswade Road Bridge, Eskbank (Overbridge 14) Re-pointing of bridge arch ring.
Midlothian 8 Bonnyrigg Road, Eskbank (Overbridge 15)

Re-pointing.

Replacement of damaged stonework.

Midlothian 11 Dalhousie Mains Bridge, Lothian Bridge (Underbridge 17)

Re-pointing and repairs to abutments and wingwalls.

Reconstruction of spandrel wall on east side of bridge.

Replacement of handrails.

Cleaning and repainting of cantilever supports.

Midlothian 11, 12 Newbattle Viaduct, Lothian Bridge Re-pointing, repairs and replacement of bricks.
Midlothian 13 Murderdean Road Bridge, Newtongrange (Overbridge 19)

Repairs and re-pointing to masonry.

Removal of infill material.

Midlothian 15 Redhaugh Farm Bridge, Redhaugh (Overbridge 21)

Repairs and re-pointing to abutments and wingwalls.

Shot blast cleaning and painting bridge girders.

Construction of parapets to replace existing handrails.

Midlothian 16 Povert Road Bridge, Redhaugh(Overbridge 22)

Repairs and re-pointing.

Waterproofing works to bridge arch.

Midlothian 21 Existing Footbridge, Fushiebridge (Footbridge 28) Removal of bridge superstructure.
Midlothian 21 Former Fushiebridge Station Bridge, Fushiebridge (Overbridge 29)

Repairs and re-pointing.

Waterproofing works to bridge arch.

Midlothian 22 Catcune Farm Bridge, Catcune (Overbridge 30) Demolition and replacement of bridge.
Midlothian 22 Catcune Farm Accommodation Bridge, Catcune (Underbridge 31)

Re-pointing and repairs.

Waterproofing works to bridge arch.

Removal and replacement of wrought iron handrail.

Midlothian 24 Castle Road Bridge, Borthwick Mains (Overbridge 32) Repairs and re-pointing.
Midlothian 24 Borthwick Mains Bridge, Borthwick (Underbridge 33)

Repairs to masonry.

Removal and replacement of wrought iron handrail.

Midlothian 25 Halflaw Kiln Bridge, Birky Side (Overbridge 34)

Demolition and replacement of bridge superstructure.

Repairs and re-pointing to bridge.

Midlothian 26 Halflaw Bow's, Maggie Bowies Glen (Overbridge 35)

Demolition and replacement of bridge deck and parapets.

Repairs to masonry.

2SSection 53 of the Listed Buildings Act (acts causing or likely to result in damage to listed buildings) shall not apply to anything done in exercise of the powers conferred by Part 1 of this Act with respect to works.

3SIn this schedule—

  • the Listed Buildings Act” means the Planning (Listed Buildings and Conservation Areas) (Scotland) Act 1997 (c. 9); and

  • building” and “listed building” have the same meanings as in the Listed Buildings Act.

SCHEDULE 10SCode of construction practice

(introduced by section 46)

1SBefore commencing construction of the authorised works located in the area of a local planning authority the authorised undertaker shall secure that there is submitted to that local planning authority for its written approval—

(a)the code of construction practice; and

(b)one or more draft local construction codes relating to so much of the authorised works as is situated in the area of the local planning authority concerned.

2SThe local planning authority shall send a copy of every code submitted pursuant to paragraph 1, and any amendment or replacement proposed by the authorised undertaker pursuant to paragraph 3, to SNH and SEPA and shall take account of any representations made to the local planning authority by either of those bodies.

3SThe authorised undertaker may with the approval of the local planning authority (and shall if so required by the local planning authority) amend or replace the code of construction practice or any local construction code.

4SThe provisions of the code of construction practice and any local construction code, as from time to time amended or replaced shall have effect as conditions to which section 48 applies.

SCHEDULE 11SWorks affecting the River Tweed Special Area of Conservation

(introduced by section 47)

Part 1 SWorks requiring special measures

1SThis Part of this schedule applies to the sites specified in the table.

Location ID No. Description Co-ordinates
(1) (2) X Y
      (3)
4 Confluence of Gala Water and Shoestanes Barn 340406 654396
5 Underbridge 49, near Heriot 340406 654396
6 Proposed river diversion (part of Work No. 5D) 340512 654217
7 Replacement culvert near Shoestanes (part of Work No. 5) 340509 654093
8 River bank, near Heriot Station 340570 653982
9 River bank protection, near Stagebank 341113 653144
10 Underbridge 52, near Little Gala 341542 652594
11 River bank protection, near Haltree 341845 652269
13 Underbridge 53, near Crookstone Mill 342456 651192
14 Underbridge 54, Hollowsbank 342373 650850
15 Underbridge 55, Hollowsbank 342346 650768
16 Underbridge 56, near Bower 342352 650341
17 Underbridge 58, Fountainhall 342992 649536
18 Riverbank protection, near Burnhouse 343487 649126
19 Underbridge 60, Plenploth North 344152 648785
20 Underbridge 61, Torquhan South 344300 647927
22 Riverbank protection, Pirnhouse 344469 647167
23 Underbridge 64, Watherston Culvert 344325 646697
24 Riverbank protection, Craigsbank 344303 646495
25 Underbridge 65, Watherston Bridge 344166 646031
26 Underbridge 67, Gala Bank 344308 645582
27 Riverbank protection, Millbank, Section 1 344699 645369
28 Riverbank protection, Millbank, Section 2 345158 645175
29 Riverbank protection, Lady's Park, near Stow 345420 643931
30 Underbridge 70, Luggate Bridge 345265 643137
31 Underbridge 72, Ferniehurst Water 344790 641965
32 Underbridge 73B, between Bowshank Farm and Gala Water 345187 641416
33 Underbridge 74, Bowshank North 345230 641382
34 Underbridge 77, Bowshank South 345419 641059
35 Riverbank protection, Bowshank South 345384 640816
36 Underbridge 78, Bowshank South 345417 640794
37 Riverbank protection, Bowland 345599 640064
38 Riverbank protection, Whitelee House 346533 639191
39 Underbridge 83, Whitelee Culvert 346668 639144
40 Underbridge 84, Whinwater 347089 638912
41 Riverbank protection, Gala Water at Torwoodlee 347292 638846
42 Underbridge 87, Torwoodlee Water 347505 637885
43 Underbridge 88, Torwoodlee Culvert 347501 637865
45 Underbridge 92, Ryehaugh Water 347568 637496
46 Underbridge 95, Kilnknowe 348260 637030
49 Underbridge 104, Red Bridge 351570 635256
50 Underbridge 45, near Heriot 339946 655241
51 Underbridge 47, near Heriot 340284 654752
52 Underbridge 48, near Heriot 340366 554513

2SThe authorised undertaker shall not undertake any works for the protection of river banks at sites ID8, ID9, ID11, ID22, ID24, ID27, ID28, ID29, or ID37.

3SThe location of any work for the protection of river banks to be undertaken by the authorised undertaker at sites ID4, ID18, ID35, ID36, ID38, ID41, ID42 and ID43 shall be approved by SNH.

4SBefore commencing the construction of any works, or carrying out any operations, at any of the sites to which this schedule applies, the authorised undertaker shall consult SNH regarding—

(a)detailed engineering design;

(b)construction methods;

(c)pollution control;

(d)timing of works and operations;

(e)conservation of specific habitats or of habitats of specific species,

and shall implement such detailed mitigation measures regarding such matters as SNH may require.

5SThe authorised undertaker shall secure that the code of construction practice is amended from time to time as appropriate so as to procure the carrying out of measures required pursuant to paragraph 4.

6SWhere and to the extent that any measure required by paragraph 4 cannot be dealt with in the code of construction practice (as from time to time amended or replaced), it shall be specified in an agreement to which the local planning authority and the authorised undertaker are party.

7SAny provision amending the code of construction practice pursuant to paragraph 5, and the provisions of any agreement entered into pursuant to paragraph 6, shall have effect as a condition to which section 48 applies.

Part 2 SWorks not requiring special measures

Location ID No. Description Co-ordinates
(1) (2) X Y
      (3)
12 Underbridge 5, Crookstone 341930 652185
21 Underbridge 62, Pirnhouse 344445 647576

SCHEDULE 12SProvisions of original enactments applied to authorised works

(introduced by section 50)

Enactment Provisions applied
(1) (2)
Musselburgh and Dalkeith Water Act 1871 (c.cxxxiii) Sections 14, 15 and 16
Melrose District Water Order Confirmation Act 1904 (c.cxlvii) In the Melrose District Water Order 1904, section 9
Edinburgh and District Water Order Confirmation Act 1904 (c.xlxxxviii) In the Edinburgh and District Water Order 1904, section 7
Galashiels Drainage and Burgh Extension Order Confirmation Act 1908 (c.cxxviii) In the Galashiels Drainage and Burgh Extension Order 1908, section 16
Edinburgh Corporation Order Confirmation Act 1970 (c.lx) In the Edinburgh Corporation Order 1970, section 25
Edinburgh Corporation Order Confirmation Act 1971 (c.xxxvii) In the Edinburgh Corporation Order 1971, section 36